Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T19CM02103
Parcel: 11007414D

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T19CM02103
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/26/2019 RMCCOY1 ELECTRICAL-COMMERCIAL REVIEW Needs Review Please address the following electrical plan review comments. Also provide a written response.
1. Provide complete compliance with the 2012 Tucson/Pima County Outdoor Lighting Code for the exterior lighting. Provide evidence on the plans that the proposed exterior lighting fully complies with the Outdoor Lighting Code. See section 104 for plan submittal requirements, table 401 lighting area and option, 402.1 (light source color temperature requirements), shielding requirements, etc . Do not confuse the Outdoor Lighting Code with the IECC.
2. Provide load calcs, amps and AIC ratings for the existing electrical service. Justify the AIC ratings of the new panels 'A' and 'B'.
Ref; 2017 NEC, 2012 Tucson/Pima County Outdoor Lighting Code (OLC), 2018 IBC sec 107.2.1.
3. Sign stamps on plan sheets . IBC 107.2.1.
4. Provide panel schedule for new panel . IBC 107.2.1.
Respond to plan review comments in writting .
Cloud all revisions .
06/26/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
06/26/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Comment not addressed. [Initial comment: Show that the proposed replacement rooftop units meet the requirements of Sections C403.3, C403.4, and C403.5 (e.g. provide the mechanical compliance certification from COMcheck). Reference: Section C501.4, International Energy Conservation Code 2018.]
2. Comment not addressed. [Initial comment: Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018.]
3. Coordinate the outside air flow rates for the new rooftop units with the ventilation calculations. [Initial comment: Provide calculations to show how ventilation will be provided for the occupied spaces. Reference: Section 401.2, IMC 2018.]

Final Status

Task End Date Reviewer's Name Type of Review Description
06/28/2019 QJONES1 REJECT SHELF Completed