Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T19CM02046
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/26/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
04/19/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide compliance with NEC art 705.12B(2) for the feeders downstream of the PV Tap Interconnection. See pages 19 thru 23 of the TUCSON 2017 NEC TRAINING, "Changes to Article 690 and 705 of the NEC 2017 Code" course material by Bill Brooks. (TEP) UNISOURCE building. 2. Provide feeder sizes and types for the load feeders from the 500 KVA transformer to the loads. 3. Verify that the feeder size and type is adequate to support the sum of the current from both sources, or provide a OCPD on the load side of the PV Interconnection Tap. Ref; 2017 NEC, 2018 IBC sec 107.2.1, Bill Brooks 2017 PV Training, Also page #143 of "Photovoltaic Power Systems" publication by IAEI Author, John Wiles. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/06/2019 | AMARTIN1 | OUT TO CUSTOMER | Completed |