Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM01349
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/25/2019 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
02/25/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Show the size, routing, and termination of the condensate drains. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson. 2. Provide calculations to show how ventilation will be provided for the occupied spaces. Reference: Section 401.2, IMC 2018. 3. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). The exhausted air from the restrooms shall be limited to no more than 10% of any subsequent supply air stream. Reference: Section 403.2.1 (4), IMC 2018. |
02/25/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
02/25/2019 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Provide the size, type and location of the backflow preventer for the water service to the building. 2. Provide the total demand that will be served by the existing 1.5" water meter. |
02/25/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
02/25/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Coordinate the proposed drain piping with the building drain design shown on the shell building drawings. 2. Correct General Note P to call for ASSE 1070-listed mixing valves for public lavatories. (See Plumbing Note 6). 3. Provide metering faucets for the public lavatories. The faucets shall dispense a maximum of 0.25 gallons of tempered water per cycle and each cycle shall last for at least 10-seconds for accessibility. 4. An elevated laundry tub is not an approved location fpr termination of a T&P relief. Reference: Section 504.6 (6), IPC 2018. |
02/26/2019 | NROSS1 | ENGINEERING | REVIEW | Passed | |
02/26/2019 | NICHOLAS ROSS | ZONING | REVIEW | Approved | |
02/26/2019 | MASHFOR1 | FIRE | REVIEW | Approved |