Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T19CM01258
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/28/2019 | MASHFOR1 | FIRE | REVIEW | Approved | |
| 03/21/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | Please provide full size electrical plans sealed by a Professional Electrical Engineer registered in the State of Arizona. Ref; City of Tucson Commercial Plan Submittal Requirements. |
| 03/21/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | 1. Sheet PV-1: This sheet must be sealed, signed, and dated by an Arizona licensed professional unless this is a residential project. Please verify. 2. Sheets S1, S2, and S3: These sheets must be sealed, signed, and dated by an Arizona licensed professional engineer. 3. Sheets S1, S2, and S3: Please revise the sheet numbers as required. 4. Sheet S2 (Section B); Structural Calculations (Sheet 2.0): The profile of the carport structure in the calculations does not match the profile on the drawings. Please coordinate. 5. Sheet S2 (Member Sizes Table); Structural Calculations (Sheet 4.12): The calculations indicate a 0.135" thickness for the beam, while the drawing indicates a 0.105" thickness. Please coordinate. 6. Sheet S2 (Pier Footing B1); Structural Calculations (Sheet 6.0): The drilled pier depths differ in the calculations and the Detail B1. Please coordinate. 7. Sheet S2 (Spread Footing B2); Structural Calculations (Sheet 6.3): The footing sizes differ in the calculations and the Detail B2. Please coordinate. 8. Structural Calculations; Sheets 3.3, 3.7, 3.11, 3.19, 3.23, 3.27, and 3.31: The purlins on Sheets 3.3, 3.7, 3.19, and 3.23 indicate a 0.063" thickness for the purlins, while Sheets 3.11, 3.27, and 3.31 indicate 0.058". Please coordinate. 9. General: Please provide the Special Inspection Certificate with Parts A and B completed. 10. General: Please provide written responses to all review comments. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/21/2019 | AVAUGHN1 | APPROVAL SHELF | Completed |
| 03/15/2019 | AVAUGHN1 | OUT TO CUSTOMER | Completed |
| 03/15/2019 | AVAUGHN1 | REJECT SHELF | Completed |