Review Date Reviewer's Name Type of Review Description Status Comments
02/20/2019 ALEXANDRA HINES ZONING REVIEW Approved
02/20/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
02/20/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Provide a complete compliance with the 2018 IECC for the lighting.
Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC
02/20/2019 AHINES2 ENGINEERING REVIEW Passed
02/20/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A1.0; Floor Plan: Per the IBC Section 2902.3.1, the route to public toilet facilities shall not pass through storage rooms. Please revise the plan.
2. Sheet A1.0; Plumbing and Mounting Height Schedule: Please add the location of the horizontal and vertical grab bars per the ICC/ANSI A117.1 Figure 604.5.1.
3. Sheet A1.0; Accessory Schedule: Please correct the symbol in the schedule from a circle to a hexagon.
4. Sheet A1.0; Wall Type W2: Please provide a detail for the end of wall tube column connection to the floor slab.
5. General: Per the IBC Section 107.2.6, please add a site plan to the drawings meeting the criteria of that section.
6. General: Please provide written responses to all review comments.
02/20/2019 ROBERT SHERRY WATER REVIEW Completed
02/20/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
02/20/2019 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
02/21/2019 MASHFOR1 FIRE REVIEW Approved Plan set states that deferred submittal will be submitted to TFD for modification. Building is currently already sprinklered.