| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/21/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/05/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | N/A |
| 03/05/2019 | AMARTIN1 | ENGINEERING | REVIEW | Passed | |
| 03/05/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet T1.0; Project Information: This permit must meet the requirements of the 2018 IBC, 2018 IMC, and the 2017 NEC. Please revise the note, and verify the requirements for those codes are met. 2. Sheet A1.0; Sales Support Note: This note indicates "no high pile storage per 2012-IFC 3202". Please revise this to the 2018 IFC, revise the section as required, and verify there is no change in the requirements. 3. Sheet A1.0; Floor Plan: Please verify all walls indicated on this plan are existing and were included in the T18CM07570 shell building review. 4. Sheet A1.1; Floor Plan: Please include a detail on this sheet of the connection of the racks to the floor slab. 5. Sheet A1.4; Elevation 3: Please add the dimensions locating the vertical grab bar from the back wall and from the floor per the ICC/ANSI Figure 604.5.1. 6. Sheet A1.4; Elevation 8: Please provide the member sizes of the water heater support, how those members are connected to each other, how those members are connected to the horizontal wall blocking, the blocking size, and how the blocking is connected to the wall studs. 7. Sheet A1.4; Enlarged Restroom Plan: In the men's and women's toilets, the Elevation 3 is indicated in the wrong direction. Please revise. 8. Sheet MP1; Plan: The plan orientation on this sheet does not match the plan on Sheet A1.0. Please verify. 9. General: Please provide written responses to all review comments. Reviewed by Eric Newcomb Contact at 520-837-4911 or Eric.Newcomb@tucsonaz.gov |
| 03/07/2019 | AMARTIN1 | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 03/07/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 03/07/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 03/12/2019 | AMARTIN1 | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 03/19/2019 | AMARTIN1 | ZONING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/18/2019 | AVAUGHN1 | REJECT SHELF | Completed |