Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM01191
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/19/2019 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
02/19/2019 | GPERU1 | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
02/19/2019 | GPERU1 | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide written responses to all plan review comments: 1. Indicate the circuit designation and wiring method for the new tankless water heater. |
02/19/2019 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
02/19/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
02/19/2019 | GPERU1 | WATER | REVIEW | Reqs Change | |
02/19/2019 | GPERU1 | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Please provide written responses to all plan review comments. 1. Please show and provide the routing for T&P for new water heater if required by water heater manufacturer. IPC 504.4 2. The water supply connection to the coffee maker machine requires protection against backflow by a back-flow preventer conforming to ASSE 1022 or ASSE 1024, or protected by an air gap. IPC 608.17.1.2 3. Provide the size and description of the existing water meter for verification of adequate service capacity for new plumbing fixtures. IPC 603.1 |
02/19/2019 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
02/20/2019 | MASHFOR1 | FIRE | REVIEW | Approved |