Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T19CM01138
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/02/2019 | RMCCOY1 | BUILDING-COMMERCIAL | REVIEW | Approved | |
04/02/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
04/02/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Ref: Outdoor Lighting Calcs. (a) The proposed Special Inspector for outdoor lighting is not on the Approved List. See the Pima County List of approved special inspectors for lighting. (b) Verify compliance with section 403.5 for the unshielded luminaires. Ref; 2012 Tucson/Pima County Outdoor Lighting Code, Pima County Special Inspectors list. |
04/02/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the location of the regulator shown on detail 5/P4.1 to agree with the gas schematic on sheet P3.1. [Initial comment: Southwest Gas, the local gas utility, provides natural gas at 7" WG, 2 PSIG, and 5 PSIG. Appliances needing gas service at 7" WG or greater (e.g. the fryers and the griddle) will require a gas meter that delivers at least 2 PSIG gas into a regulator located after the meter set. Clarify the location of the regulator. Reference: Section 402.1, IFGC 2018.] 2. Revise the geometry of the sediment trap per Section 408.4, IFGC 2018. [Initial comment: Revise the configuration of the natural gas trap, as shown in detail 1/P4.1, to comply with the requirements of Section 408.4, IFGC 2018 (i.e. the sediment trap is to be located downstream of the appliance shutoff valve, as close to the appliance as possible).] |
04/04/2019 | AVAUGHN1 | ZONING | REVIEW | Needs Review | |
04/04/2019 | AVAUGHN1 | ENGINEERING | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/04/2019 | AVAUGHN1 | APPROVAL SHELF | Completed |
04/04/2019 | AVAUGHN1 | OUT TO CUSTOMER | Completed |
04/04/2019 | AVAUGHN1 | REJECT SHELF | Completed |