Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM01102
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/25/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/07/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 03/15/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 03/15/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. An approved development plan is not to be used for construction or modification of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, etc.). Provide the civil plans referenced on sheetsP1.1 and P2.1 to show the extension of the water service to the water meter and the building sewer to the public sewer. 2. Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 3. A common vent is limited to serving two traps or trapped fixtures. Reference: Section 911.1, IPC 2018. 4. General Note #3 on sheet A2.2 refers to roof drainage calculations on sheet P2.1. Provide the roof drainage calculations and drainage design. |
| 03/19/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide energy code compliance calculations for the addition to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C402, C502.1, International Energy Conservation Code 2018. 2. Provide sheet A6.1. Reference: Section 107.2.1, IBC 2018. |
| 03/19/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide complete compliance with the 2012 Tucson/Pima County Outdoor Lighting Code for the exterior lighting. Provide evidence on the plans that the proposed exterior lighting fully complies with the Outdoor Lighting Code. See section 104 for plan submittal requirements, table 401 lighting area and option, 402.1 (light source color temperature requirements), shielding requirements, etc . Do not confuse the Outdoor Lighting Code with the IECC. 2. Provide the conductor, conduit sizes and types, quantities, for the secondary feeders for the electrical service. Ref; 2017 NEC, 2012 Tucson/Pima County Outdoor Lighting Code (OLC), 2018 IBC sec 107.2.1. |
| 03/28/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Needs Review | Development Plan must be approved first. |
| 03/28/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T19CM01102 - Expansion to existing carwash building (Commercial Use- Special Exception) Building Plan Review (1st Review) Dynamite Carwash 5071 S. 12th Avenue - C-1 Zoning - Related to DP19-0042 & T10SE00119 TRANSMITTAL DATE: March 28, 2019 DUE DATE: March 22, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the Building plans for compliance with the unapproved version of the development package. While the building footprint and the site revisions are consistent with the unapproved version of the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc.) zoning cannot approve the building plans until the PDSD Commercial Plans reviewers have approved the building plans. 2. COMMENT: Zoning will review the building plans on the next submittal and do a comparison to the approved DP if available to assure consistency with what is proposed on the DP drawings as it relates to the zoning review purview as noted above and any conditions related to the change of PDP. 3. COMMENT: If any changes are necessary to the building plans due to plan review comments that affect zoning requirements the DP will have to be revised to reflect the changes. Once the DP is approved by all reviewers and the building plans are approved by the Commercial Plans reviewers zoning can approve the building plans. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: building plans |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/10/2019 | AVAUGHN1 | APPROVAL SHELF | Completed |
| 04/10/2019 | AVAUGHN1 | OUT TO CUSTOMER | Completed |
| 04/10/2019 | AVAUGHN1 | REJECT SHELF | Completed |