| 04/05/2019 | MASHFOR1 | FIRE | REVIEW | Approved | Fire Alarm is required and noted on the plan set as a deferred submittal |
| 04/05/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide Structural Calculations for the Pre-Engineered Metal Building . IBC 107.2.1. 2. Provide Structural Calculations for the proposed footings , foundation , and anchoring design of the Foundation Plan for the Pre-Engineered Metal Building . IBC 107.2.1. 3. Sheet S2.2 , Detail 35 / S8.3 is not located on sheet S8.3 . Please clarify . IBC 107.2.1. Please respond in writing to all plan review comments . |
| 04/15/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 04/15/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide calculations for the building envelope to demonstrate compliance with the energy code (e.g. COMcheck - the information on sheet T1.2 appears to be for a different building). Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. As a minimum, the information shall include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2018. 2. Provide heating load calculations to justify the heating capacities of the specified unit heaters. Reference: Section C403.1.1, IECC 2018. 3. Replot sheet M1.1 so that the background is visible. Reference: Section 107.2.1, IBC 2018. |
| 04/15/2019 | ROBERT SHERRY | WATER | REVIEW | Passed | |
| 04/25/2019 | ALEXANDRA HINES | ZONING | REVIEW | Approved | |
| 04/30/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Ref; Plan Sheet E1.2. The outdoor lighting lumen calcs on the top of the plan do not correlate with the calcs at the bottom of the plan. Please clarify. 2. Provide a note requiring a special inspection for the outdoor lighting as specified per section 104.2.2. 3. Provide manufacture cut sheets for the SA, SB, and A luminaires. 4. Ref; Plan Sheet E1.1. The panel marked L1C is not marked as existing. Is this also a new panel? Please clarify. 5. Provide complete electrical plans for the exterior lighting. Show designated branch circuit numbers and panel. Ref; 2017 NEC, 2018 IBC sec 107.2.1, Tucson/Pima County Outdoor Lighting Code. |
| 05/01/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 05/06/2019 | PMARTIN1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/13/2019 | AVAUGHN1 | OUT TO CUSTOMER | Completed |