Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/11/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
04/12/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Please verify the information indicated on architectural details and sections (Sheets A5.1 through A5.6) that indicate "per structural" are coordinated and provided . IBC 107.2.1. 2. The structural calculations were not submitted with the drawings. Please provide. IBC 107.2.1. 3. Please provide the Special Inspections Certificate with Parts A and B completed , inspectors must be approved by the City of Tucson to perform inspections . IBC 1703. |
04/16/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
04/17/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Clarify the insulation used in the exterior insulation. Sheet A5.5 shows R-13 cavity insulation in the walls and 4" of polyisocyanurate foam insulation for the roof (approximately R-20ci) but COMcheck calls for R19 cavity insulation for the walls and R-35 continuous insulation for the roof. [Initial comment: Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Section C502.1, International Energy Conservation Code 2018.] |
04/18/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
04/30/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: David Rivera Zoning review PROJECT: Kasser Family Gallery Expansion T19CM00550 Building Plan (1st Review) TRANSMITTAL DATE: April 30, 2019 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. The building plans have been reviewed for compliance with development package DP18-0276 and although it appears that the building plans meet the requirements of SP18-0276 Zoning cannot approve the building plans until the development package has been approved. 3. Until all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
05/02/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
05/06/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Approved |