Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T19CM00550
Parcel: 117200030

Address:
140 N MAIN AV

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T19CM00550
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/15/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Clarify how backflow protection is provided for the RO equipment and humidifier. Reference: Sections 608.3 and 608.17.10, IPC 2018.
2. Show the termination point for the RO reject water. Reference: Section 802.1.5, IPC 2018.
3. Provide roof drainage calculations to verify the pipe sizes for the addition and to confirm the ability of the existing underground storm drain to accommodate the new total flow rate. Reference: Section 1106.1, IPC 2018.
4. Verify that the existing underground storm drains are suitable for use under the building addition. Reference: Section 1102.3, IPC 2018.
02/15/2019 ROBERT SHERRY WATER REVIEW Reqs Change Provide the size and serial number of the water meter serving the existing museum and the new addition. Provide the total water demand that the meter will serve. Reference: Section 107.2.1, IBC 2018.
02/20/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet G0.1 (Code Review); Sheet G0.2 (Site Plan): The Site Plan indicates the existing building #6 is 28,728 SF, while the Code Review indicates 13,866 SF (ground floor). Please clarify.
2. Sheet G0.1; Code Review: Please review and revise the total SF listed as required.
3. Sheet G0.1; Code Plan: Please indicate on the plan the common paths of egress travel, and verify those distances meet the requirement of the IBC Table 1006.2.1.
4. Sheet G0.1; Code Review (Fire Protection Systems): This section indicates a fire alarm detection system is not required per the IBC Section 907.2.1. It is not required if the exception provisions (equipped with an automatic sprinkler system installed per Section 903.3.1.1 and occupant notification appliances will activate throughout notification zones upon sprinkler water flow. Please verify the requirements of the exception statement are met.
5. Sheet G0.1; Code Review (Plumbing Systems): The fixture calculations are based on 828 total occupants. This addition accounts for 200 occupants. Please indicate on this sheet how the other 628 occupant load was calculated for the A-3 occupancy classification, and how the 9 (should this be 10?) occupant load was calculated for the S-2 occupancy classification.
6. Sheet G0.1; Code Review (Plumbing Systems): Please indicate on the drawing one service sink is required.
7. Sheet G0.2; Site Plan: This plan indicates the new Building #6 expansion is 28,728 SF. Please revise to match Sheet G0.1 Code Review.
8. Sheet A0.1; Detail 2: Please darken note reference numbers and dimensions. In addition, the City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height for the note reference numbers.
9. Sheet A0.1; Keynotes: Add verbiage to Note 2 to reference structural sheet S3.0 for the retaining wall at the stage.
10. Sheet A1.1; Keynotes: Note 18 indicates cmu infill. Please provide a cmu detail at this location.
11. Sheet A1.1; Floor Plan: An exterior elevation indicator north of Grid 7 (on Grid C) references A011/1. Should this be Sheet A3.1? Please verify.
12. Sheet A1.1; Floor Plan: An exterior elevation indicator south of Grid 1 (near Grid F) references A011/2. Should this be Sheet A3.1? Please verify.
13. Sheet A5.1; Detail 2: Please indicate the structural beam that is located on Grid F at the high roof (see structural).
14. Sheet A5.1; Detail 2: In Notes 5 and 15, please indicate the metal stud gauge and spacing, or reference structural drawings if addressed there.
15. Sheet A5.1; Detail 4: In Note 6, please indicate the metal stud gauge and spacing, or reference structural drawings if addressed there.
16. Sheet A5.1; Detail 2: In Note 3, please indicate these metal studs are furring.
17. Sheet A5.2; Detail 1: In Note 1, please indicate the metal stud gauge and spacing, or reference the structural drawings if addressed there.
18. Sheet A5.2; Detail 6: In Notes 5 and 10, please indicate the metal stud gauge and spacing, or reference the structural drawings if addressed there.
19. Sheet A5.3; Detail 7: Note 8 was not indicated on this detail. Please verify.
20. Sheet A5.3; Detail 10: Note 12 is indicated on the detail, but not listed in the notes. Please verify.
21. Sheet A5.3; Detail 9: No detail for this condition was found on the structural sheets. Please coordinate the architectural and structural.
22. Sheet A5.4; Section 1: Note 1 was not indicated on this detail. Please verify.
23. Sheet A5.6; Detail 1: Note 11 indicates reinforcing cmu on top of the existing wall. Please provide a detail at that condition.
24. Sheet A5.6; Section 1: In Note 3, please indicate the metal stud gauge and spacing, or reference the structural drawings if addressed there.
25. Sheet A5.6; Section 2: In Note 11, please indicate the metal stud gauge and spacing, or reference the structural drawings if addressed there.
26. Sheet S1.0; General Structural Notes (Loads): Per the IBC Sections 1609.1.1 and 1609.3, the basic design wind speed (V) has replaced the ultimate wind speed (Vult). Please revise that notatiion in the Loads section of the General Structural Notes.
27. Sheet S1.1; General Structural Notes (Structural Observations): Per the IBC Section 1704.6.1, structural observations are not required for this project unless Items 3 and 4 of that Section are necessary. Please verify.
28. Sheet S1.1; General Structural Notes (Cold Formed Steel): Please complete the joists size in Note 9.
29. Sheet S3.0; Detail 101: Please add dimensions for the depth and width of the thickened slab.
30. Sheet S3.0; Detail 101: Note 7 was not indicated on the detail. Please verify.
31. Sheet S3.0; Detail 106: Note 5 indicates (6) #3. Please verify that is correct.
32. Sheet S4.0; Detail 203: Note 3 was not indicated on the detail. Please verify.
33. Sheet S4.0; Detail 210: Note 5 was not indicated on the detail. Please verify.
34. Sheet S4.1; Detail 213: Note 6 indicates "reinforcing where required". Is there a concrete slab at that detail (see Sheet S2.1)? Please verify.
35. Sheet S4.1; Detail 215: Note 1 indicates a wood beam. Please verify.
36. General: The structural calculations were not submitted with the drawings. Please provide.
37. General: Please provide the Special Inspections Certificate with Parts A and B completed.
38. General: Please verify the information indicated on architectural details and sections (Sheets A5.1 through A5.6) that indicate "per structural" are coordinated and provided.
39. General: Please provide written responses to all review comments.
02/22/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Section C502.1, International Energy Conservation Code 2018.
2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018.
3. Provide ventilation calculations based on the current mechanical code. Reference: Section 403.2, IMC 2018.
02/28/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. The applicable adopted Energy Conservation Code is the 2018. Please revise the calcs on plan sheet E3.1.
Ref; 2018 IECC.
03/04/2019 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Section Manager

PROJECT: Kasser Family Gallery Expansion
T19CM00550
Building Plan (1st Review)

TRANSMITTAL DATE: March 4, 2019

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. The building plans have been reviewed for compliance with development package DP18-0276 and although it appears that the building plans meet the requirements of SP18-0276 Zoning cannot approve the building plans until the development package has been approved.

3. Until all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
03/07/2019 LOREN MAKUS ENGINEERING REVIEW Approved If the cover sheet needs to be revised, correct the referenced DP number to DP18-0276.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/08/2019 AVAUGHN1 REJECT SHELF Completed