Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T19CM00530
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/28/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/15/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet S1 (General Structural Notes); Geotechnical Study (Page 10): The Geotechnical Study indicated a minimum embedment of 8' below grade for the drilled shaft foundation, while the General Structural Notes (Foundation Section) indicated a minimum of 7'-0" below grade. Please coordinate. 2. Sheet S2; Column/Footing Schedule: Please verify the column design calculations for the maximum clear height of 15'-6" is included in the calculations. 3. General: Please provide written responses to all review comments. |
02/25/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide a grounding detail or indicate on the line diagrams type of GEC and electrodes used for grounding the 150KVA transformer. NEC 250.30 2. Ground fault protection information was not found in the manufacturer cut sheet specifications for the inverter, s, utilized. Please verify. And provide data from the manufacturer on the plans. NEC 690.41B. Ref; 2018 IBC sec 107.2.1, 2017 NEC. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/27/2019 | AVAUGHN1 | OUT TO CUSTOMER | Completed |