Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM00074
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/05/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1.Sheet TS.1 - Project Code Check - Occupancy Type - notes Factory Industrial F-1 ( Moderate Hazard ) , the reviewer disagrees . The plan illustrates - showrooms , offices , restrooms , reception , and work area . Where is the Factory Industrial area to designate this as an F-1 . Provide correct code analysis . IBC 306 , IBC 107.2.1. 2. Sheet S.3 - Detail 4 notes 3/4" OSB Sheathing ; Detail 5 notes 1/2" OSB Roof Sheathing ; and Detail 6 notes 1/2" Plywood W/8d Nails @ 6" O.C. At Edges & 12" O.C. At Interior Supports . Please coordinate with structural calculations and correct plans . IBC 107.2.1. 3. Sheet TS.1 - Occupancy Loads ( IBC 1004.1.1 ) - 10,660 SF / 500 = 22 Occupants . 1004.1.1 is not in the 2018 IBC , 500 is not correct . Provide correct code analysis . IBC 107.2.1 ,IBC T1004.5 . 4. Provide a structural analysis for the proposed 6" steel studs . IBC 107.2.1. 5. Illustrate on the plans the means of egress and egress travel distances for the entire building including new addition . IBC Chap.10 , IBC 107.2.1. 6. Sheet TS.1 - Project Code Analysis - Exiting Requirements - Required 1 , Provided 2 , but only one exit illustrated on plan . Provide correct code analysis for exits and illustrate on plans . IBC 107.2.1. 7. Sheet TS.1 - Project Code Analysis - provide the minimum number of required plumbing fixtures with code analysis . IBC 107.2.1 , IBC 2902. 8. Sheet S.2 - Framing Keynotes - 1. New Steel Beam , See Beam Schedule , beam schedule contains wood beams . Clarify beams , columns , and lintels on plans and cooridinate with structural calculations , illustrate schedules on plans. IBC 107.2.1. 9. Sheet A.1 - Partition Types - 6C New Demising Wall - references detail 4/A.6 , but detail 4 is not on sheet A.6 . IBC 107.2.1. 10. Sheet A.2 notes Scupper Calculation IPC 2012 Table 1106.2 . The City of Tucson has adopted the 2018 I-Codes , correct plans . IBC 107.2.1. 11. Handicap ramp is illustrated on sheet TS.1 and sheet 2of4 , but handicap ramp is not illustrated on sheets A.1 , A.3 , A.4 , S.1 , P1 , M.1 , E.2 , and E.3 . IBC 107.2.1. 12. Sheet A.3 does not have an East Elevation Drawing , provide one . IBC 107.2.1. 13. Sheet A.4 - 1 Building Section notes detail 4/A.6 , but detail 4 is not on sheet A.6 . IBC 107.2.1. 14. Sheet A.1 - Partion Types - walls 6A and 6C , and sheet A.5 details 4 and 5 note R-21 insulation , but Section Drawings sheets A.4 and A.6 note R-19 . IBC 107.2.1. 15. Provide handrails for handicap ramp . IBC 1012.8 , IBC 1012.10 16. Provide guards on Dock . IBC 1015. 17. Sheet S.2 - Floor Framing Plan - notes C-2 , but is not noted in the column schedule . IBC 107.2.1. |
| 06/05/2019 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 06/11/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Correct the labels for the plumbing plans on sheet P.1 (they are reversed). Reference: Section 107.2.1, IBC 2018. 2. Clarify how the proposed water heater is to be supported from the building structure (i.e. detail 3/P.2 shows wood studs but the architectural wall schedule calls for metal studs). Reference: Section 301.2, IPC 2018 3. Verify the materials that have been used for the existing building sewer piping that will be covered by the addition are suitable for use under the addition. Reference: Section 702.2, IPC 2018 4. Horizontal branches shall connect no closer than ten diameters downstream of the bases of vertical stacks. Reference: Section 704.3, IPC 2018. 5. Provide the rim elevation of the next upstream sanitary manhole. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson. 6. Verify that the distance to the hot water terminations at the lavatories from the hot water source complies with the requirements of Section C404.5, IECC 2018. |
| 06/11/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Coordinate the building components used in the energy code analysis for the building envelope with those shown on the drawing (e.g. wall cavity insulation). Reference: Section C502.1, IECC 2018, as amended by the City of Tucson. 2. Provide sufficient detail on the drawings to compare the energy compliance of the building envelope (COMcheck) with the building components shown on the drawing. Show the maximum U-value and the maximum SHGF values for the fenestration components. Reference: Section C103.2, IECC 2018. |
| 06/11/2019 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Revise the site plan to show the location of the new ¾" water meter. Reference: Section 107.2.1, IBC 2018. |
| 06/27/2019 | RMCCOY1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 06/27/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 07/05/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | |
| 07/10/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | 1) Once the development package has been approved and all outstanding commercial building reviews are complete, engineering can approve the building plans |