Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM00074
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/07/2019 | GPERU1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | 1. As of January 1, 2019 the City of Tucson formally adopted the 2018 IBC, IFC, IMC, IPC, IECC, and the 2017 NEC. Please cite the adopted codes and verify that the basis of design is in accordance with the adopted codes. 2. Please cite the 2018 IBC on the GENERAL STRUCTURAL NOTES and verify structural calculations are in accordance with the adopted code. 3. Identify all existing exits on the floor plan. 4. Provide a Life Safety exiting plan from the first and and second floor; specify the distances to required exit and the common path of egress travel measurements. |
| 01/17/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide calculations (e.g. COMcheck) to show that the building addition complies with the requirements of the 2018 IECC. 2. Provide cooling/heating load calculations for the new heat pumps. Verify that the units are appropriatly sized. Reference: Section C403.1.1 and C403.3.1, IECC 2018. 3. Revise the 2nd floor HVAC system to avoid using the egress pathway as a duct. Reference: Section 601.2, IMC 2018. |
| 01/17/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide the missing information for the panel schedules. Ratings. Ref; 2018 IBC sec 107.2.1, 2017 NEC |
| 01/17/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 01/17/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1.Correct the size of the primary and secondary scuppers based on Section 1106.5, IPC 2018. 2. How does the roof of the existing Flooring System building shed water? 3. Provide a 10=-diameter horizontal offset to the base of the two vertical stacks. Reference: Section 704.3, IPC 2018. 4. Provide structural calculations for the effect of the cantilevered water heater platform on the building structure. Reference: Section 307.1, IPC 2018. |
| 01/18/2019 | ACONNOR1 | ENGINEERING | REVIEW | Needs Review | |
| 01/18/2019 | ANDREW CONNOR | ZONING | REVIEW | Needs Review | |
| 04/22/2019 | AVAUGHN1 | FIRE | REVIEW | Needs Review | |
| 04/22/2019 | AVAUGHN1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |