Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: ROW SWF - SUBMITTAL
Permit Number - T18RW04536
Review Name: ROW SWF - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/04/2019 | LINZUNZA | DOT STREET MAINTENANCE | REVIEW | Approved | Will require power-sharing agreement since plans call for using City power. Once agreement is established, this review to be changed to approved. |
04/04/2019 | LINZUNZA | DOT STREET MAINTENANCE | REVIEW | Approved | Streets irrigation on Congress St. runs parallel with Congress St. Depending how close they come to Congress, they may come accross TDOT irrigation lines. The contractor would be required to repair and reroute if needed. Contact Paul Rosenboom (520)419-7064 if needed. |
10/08/2018 | JSANDER1 | START | START | Completed | |
10/08/2018 | JSANDER1 | HISTORIC | Review | Approved | Approval (no impact/no adverse impact) |
10/10/2018 | LINZUNZA | IT_NETWK | REVIEW | Approved | |
11/05/2018 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approved | Reviewer: Richard Leigh 520-837-6647 - Richard.leigh@tucsonaz.gov The following comments need to be addressed in the subsequent review submittal. 1. Provide a temporary traffic control plan specific to the work site. See "Additions By The City of Tucson To The Manual on Uniform Traffic Control Devices For Temporary Traffic Control" section 5 for submittal requirements. 2. Provide a site plan showing location of proposed pole, associated cabinets, pull boxes, utility service lines, roadway and pedestrian infrastructure, existing utilities and site visibility triangles. |
11/07/2018 | JSANDER1 | DOT_ELEC | REVIEW | Reqs Change | |
11/07/2018 | JSANDER1 | REAL_ESTATE | REVIEW | Needs Review |