Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T18PI00044
Review Name: PIA - SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/04/2019 | ERNIE ENCINAS | DOT STREET MAINTENANCE | REVIEW | Completed | 01/04/2019 - per Mr. Encinas, no comments |
| 01/04/2019 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Completed | 01/04/2019 - per Mr. Encinas, no comments |
| 01/04/2019 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Completed | 01/04/2019 - per Mr. Canchola, no comments |
| 01/04/2019 | FSHENK1 | DOT MAPS & RECORDS | REVIEW | Completed | 01/04/2019 - per Scott Weber, maps and records Supervisor Maps & Records Comments: Electronic Submitted Plans are only 11" x 17" in size. Submittals should be 24" x 36" in size and at 600 PPI (Pixels Per Inch) resolution in pdf and tiff formats if Mylars are not submitted. In many locations the plans indicate that the construction is very close or abutting Right-of Way. Other ROW Pins are in areas where existing pavement is listed to be removed. Extreme care must be made to ensure construction stays within ROW and ROW Pins are not disturbed or destroyed during the construction. ROW Pins disturbed or destroyed during construction must be replaced by a Registered Land Surveyor (RLS). " Southbound Stone Ave. at Glenn St. has a curb behind the bus pad that appears to abut ROW (Pg 18 of the plans). Three ROW Pins abut or are within areas scheduled to have existing pavement removed. These ROW Pins are likely going to be disturbed or destroyed during the construction and will therefore need to be replaced. " Northbound Stone Ave. at Glenn St. has three ROW Pins within areas scheduled to have existing pavement removed (Pg 19 of the plans). These ROW Pins are likely going to be disturbed or destroyed during the construction and will therefore need to be replaced. " Southbound Stone Ave. at Fort Lowell Rd. has new sidewalk to match existing sidewalk at ROW (Pg 20 of the plans). ROW Pin likely will be destroyed during construction and will need to be replaced. Additionally two ROW Pins are within areas scheduled to have existing pavement removed. These ROW Pins are likely going to be disturbed or destroyed during the construction and will therefore need to be replaced. " Northbound Stone Ave. at Yavapi Rd. has new sidewalk to match existing sidewalk ramp nearly at ROW (Pg 21 of the plans). Care must be exercised to maintain construction within ROW and to preserve the ROW Pin. " Southbound Stone Ave. at Prince Rd. has new fence behind bus pad nearly at ROW (Pg 22 of the plans). Fence post foundation need to remain within ROW and construction of the fence is not to disturbed or destroyed ROW Pins. |
| 02/04/2019 | FSHENK1 | DOT ENGINEERING | REVIEW | Completed | Per Mr. Felix, Record Documents to address changes in field per inspection staff. |
| 02/04/2019 | FSHENK1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | Emailed Mr. Mike Holder with comments and needing to submit utility clearance receipts. |
| 02/04/2019 | FSHENK1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 02/04/2019 | FSHENK1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | Emailed Mr. Mike Holder with comments and needing to submit utility clearance receipts. |
| 02/04/2019 | FSHENK1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
| 02/04/2019 | FSHENK1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | Emailed Mr. Mike Holder with comments and needing to submit utility clearance receipts. |
| 02/04/2019 | FSHENK1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | Emailed Mr. Mike Holder with comments and needing to submit utility clearance receipts. |
| 02/04/2019 | FSHENK1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | Emailed Mr. Mike Holder with comments and needing to submit utility clearance receipts. |
| 02/04/2019 | FSHENK1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | Emailed Mr. Mike Holder with comments and needing to submit utility clearance receipts. |
| 02/04/2019 | FSHENK1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | Emailed Mr. Mike Holder with comments and needing to submit utility clearance receipts. |
| 02/04/2019 | FSHENK1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | Emailed Mr. Mike Holder with comments and needing to submit utility clearance receipts. |
| 02/04/2019 | FSHENK1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review | Emailed Mr. Mike Holder with comments and needing to submit utility clearance receipts. |
| 12/28/2018 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Completed | SUBJECT: RTA Bus Pullout Package #16 Stone Avenue PROJECT REVIEWER: Gary Wittwer, RLA, City Of Tucson Transportation RESUBMITTAL NOT REQUIRED: TDOT Landscape Review Section has reviewed the subject PIA paving plan and does recommend approval at this time. The following comments need to be addressed and plans revised prior to start of construction. Please include a response letter addressing/acknowledging the following comments to ensure items will be addressed and included on the record documents. 1. The contractor shall not trim or remove any vegetation without first consulting with City of Tucson Landscape Architect Gary Wittwer @ (837-6618). If you have any questions, I can be reached at 837-6618 or emailed at gary.wittwer@tucsonaz.gov. |