Plan Review Detail
Review Status: Active
Review Details: PIA - RESUBMITTAL
Plan Number - T18PI00043
Review Name: PIA - RESUBMITTAL
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/25/2019 | Any | UTILITY CLEARANCES | COT STREETS DIVISION | Active | |
02/25/2019 | ANY | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Active | |
02/25/2019 | Any | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Active | |
02/25/2019 | ANY | PIA COORDINATOR | OUT TO CUSTOMER | Active | |
02/25/2019 | Any | UTILITY CLEARANCES | PC WASTEWATER MGMT | Active | |
02/25/2019 | Any | UTILITY CLEARANCES | QUEST COMMUNICATION | Active | |
02/25/2019 | Any | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Active | |
02/25/2019 | Any | UTILITY CLEARANCES | COX COMMUNICATION | Active | |
02/25/2019 | Any | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Active | |
02/25/2019 | Any | UTILITY CLEARANCES | EL PASO NATURAL GAS | Active | |
02/25/2019 | Any | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Active | |
02/28/2019 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | . |
03/01/2019 | RLEIGH1 | DOT MAPS & RECORDS | REVIEW | Approved | |
03/01/2019 | RLEIGH1 | DOT ENGINEERING ADMINISTRATOR | REVIEW | Active | |
03/05/2019 | CSALTZM1 | DOT ENGINEERING | REVIEW | Approved | 1) Sht. 1 of 9: Top center under title add PIA number T18PI00043. 2) Sht. 4 of 9: Remove all cross section call outs which do not pertain to the public improvement work (A/7, B/7, C/7 & D/7). 3) Sht. 6 of 9: Remove Detail 2 Combination Curb/Sidewalk. Use only standalone PAG Standard curb and standard sidewalk in the the public right of way. 4) Sht. 7 of 9: all cross sections remove note "And Gutter" and also remove gutter from the cross sections. 5) Sht. 7 of 9; remove all Type Sections which do not pertain to the public improvement work (A,B C,D & E) 6) Sht. 8 of 9 : Correct cross section call out from H/8 to H/7. 7) FYI - On Sht. 2 of 9: Call out to remove curb (note3) for new driveways . This requires new curb and saw cut and replace asphalt. The curb can be saw cut for the driveway opening (if the curb is in good condition) and the new driveway constructed with the existing curb. |