Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - RESUBMITTAL
Plan Number - T18PI00041
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/21/2019 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | How will the median island be watered? Water truck? Please add my standard notes for planting in ROW. If you do not have them - please e-mail me and request them. |
04/10/2019 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | |
04/10/2019 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | April 10, 2019 SUBJECT: Silverbell Crossing - Phase B, Paving Plans - T18PI00041 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: TDOT Technical Review Section has reviewed the PIA paving plan and recommends a conditional approval at this time. The following comments need to be addressed prior to submittal of the mylar plan set for signatures. Please email a PDF copy of the revised plans for final review prior to submitting mylars. 1. Use TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering. If you have any questions please call me. 2. Sheet 4, Detail 1: Barricade railing is not required on curb side of side walk scupper. Revise detail to indicate this. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
04/10/2019 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | Please submit utility confgirmation receipts. |
04/10/2019 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
04/10/2019 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | Please submit utility confgirmation receipts. |
04/10/2019 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
04/10/2019 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
04/10/2019 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
04/10/2019 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
04/10/2019 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
04/10/2019 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
04/10/2019 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review |