Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T18PI00041
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2019 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | January 4, 2019 ACTIVITY NUMBER: T18PI00041 PROJECT NAME: Silverbell Crossing Phase B (Lots 1-46) PROJECT REVIEWER: Zelin Canchola TDOT The plan is acceptable. However on change is required. Eliminate Stop sign at the T-Intersection of Kellen Canyon (east bound) show on final milar. Zelin.canchola@tucsonaz.gov |
01/07/2019 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | The small median island at the entry and common areas- if they are to be planting with irrigation then you will need to resubmit with a full landscape and irrigation plan. Remember that you must provide an easement for any private irrigation line crossing public roads. If this is the intent - please give me a call so that I can give you all the requirements. 837-6618 |
02/01/2019 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | February 11, 2019 SUBJECT: Silverbell Crossing - Phase B, Paving Plans - T18PI00041 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: TDOT Permits Section has reviewed the PIA paving plan and does not recommend approval at this time. The following comments need to be addressed in the subsequent review submittal. Please return redlined drawings with next submittal. Please reference PIA activity number on all correspondences. 1. Include the plan number "I-2018-025" in the title block of each sheet. 2. Include the PIA activity number "T18PI00041" on cover sheet. 3. Use TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering. 4. Sheet 3: Delineate existing slope easement north of the project and label with recordation information. Additionally, a drainage easement will need to be secured for placement of the proposed drainage structure and channel Tucson City Golf Course. 5. Sheet 3: Provide details of the proposed wrought iron fence along the cul-de-sac at the north end of Kellen Canyon Court. 6. Sheet 4: Unobstructed pedestrian access will need to be provided from Silverbell Rd.to Kellen Canyon Court. 7. Revise drawing to indicate the placement of 5' wide sidewalk per Technical Standards Manual, Section 10-01.4.1.A.1.a. 8. Sheets 5, Detail C: The storm drain outlet proposed at the the cul-de-sac at the north end of Kellen Canyon Court will need to be day-lighted. A bubble-up system will require additional maintenance. Additionally, provide alternate bicycle safe grates, other than EF-1 type, at the inlet of this system. 9. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
02/19/2019 | FSHENK1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
02/19/2019 | LPETERS2 | DOT PERMITS & CODES | REVIEW | Approved | |
02/19/2019 | FSHENK1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
12/21/2018 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Completed | Per email from 12/12/2018, no comments from JFemling |
12/28/2018 | FSHENK1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
12/28/2018 | FSHENK1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
12/28/2018 | FSHENK1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
12/28/2018 | FSHENK1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
12/28/2018 | FSHENK1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
12/28/2018 | FSHENK1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
12/28/2018 | FSHENK1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
12/28/2018 | FSHENK1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
12/28/2018 | FSHENK1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review |