Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T18PI00041
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T18PI00041
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2019 ZELIN CANCHOLA DOT TRAFFIC REVIEW Approved January 4, 2019
ACTIVITY NUMBER: T18PI00041
PROJECT NAME: Silverbell Crossing Phase B (Lots 1-46)

PROJECT REVIEWER: Zelin Canchola TDOT

The plan is acceptable. However on change is required.

Eliminate Stop sign at the T-Intersection of Kellen Canyon (east bound) show on final milar.

Zelin.canchola@tucsonaz.gov
01/07/2019 GARY WITTWER DOT LANDSCAPE REVIEW Denied The small median island at the entry and common areas- if they are to be planting with irrigation then you will need to resubmit with a full landscape and irrigation plan. Remember that you must provide an easement for any private irrigation line crossing public roads. If this is the intent - please give me a call so that I can give you all the requirements. 837-6618
02/01/2019 RICHARD LEIGH DOT ENGINEERING REVIEW Reqs Change February 11, 2019


SUBJECT: Silverbell Crossing - Phase B, Paving Plans - T18PI00041

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: TDOT Permits Section has reviewed the PIA paving plan and does not recommend approval at this time. The following comments need to be addressed in the subsequent review submittal. Please return redlined drawings with next submittal. Please reference PIA activity number on all correspondences.

1. Include the plan number "I-2018-025" in the title block of each sheet.

2. Include the PIA activity number "T18PI00041" on cover sheet.

3. Use TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering.

4. Sheet 3: Delineate existing slope easement north of the project and label with recordation information. Additionally, a drainage easement will need to be secured for placement of the proposed drainage structure and channel Tucson City Golf Course.

5. Sheet 3: Provide details of the proposed wrought iron fence along the cul-de-sac at the north end of Kellen Canyon Court.

6. Sheet 4: Unobstructed pedestrian access will need to be provided from Silverbell Rd.to Kellen Canyon Court.

7. Revise drawing to indicate the placement of 5' wide sidewalk per Technical Standards Manual, Section 10-01.4.1.A.1.a.

8. Sheets 5, Detail C: The storm drain outlet proposed at the the cul-de-sac at the north end of Kellen Canyon Court will need to be day-lighted. A bubble-up system will require additional maintenance. Additionally, provide alternate bicycle safe grates, other than EF-1 type, at the inlet of this system.

9. Please Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov.
02/19/2019 FSHENK1 PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
02/19/2019 LPETERS2 DOT PERMITS & CODES REVIEW Approved
02/19/2019 FSHENK1 PIA COORDINATOR OUT TO CUSTOMER Completed
12/21/2018 JIM FEMLING DOT STREET MAINTENANCE REVIEW Completed Per email from 12/12/2018, no comments from JFemling
12/28/2018 FSHENK1 UTILITY CLEARANCES COT STREETS DIVISION Completed
12/28/2018 FSHENK1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Needs Review
12/28/2018 FSHENK1 UTILITY CLEARANCES PC WASTEWATER MGMT Needs Review
12/28/2018 FSHENK1 UTILITY CLEARANCES QUEST COMMUNICATION Needs Review
12/28/2018 FSHENK1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Needs Review
12/28/2018 FSHENK1 UTILITY CLEARANCES COX COMMUNICATION Needs Review
12/28/2018 FSHENK1 UTILITY CLEARANCES SOUTHWEST GAS CORP Needs Review
12/28/2018 FSHENK1 UTILITY CLEARANCES EL PASO NATURAL GAS Needs Review
12/28/2018 FSHENK1 UTILITY CLEARANCES KINDER MORGAN ENERGY Needs Review