Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T18PI00039
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/24/2019 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
01/24/2019 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | January 24, 2019 Activity Number - T18PI00039 Project Name - Tres Pueblos Este Projecr Reviewer - Zelin Canchola RESUBMITTAL REQUIRED: DOT Review Section has reviewed the PIA Plan for Traffic Engineering. Resubmit with the following 1. Add - Show quantities of new traffic signs. 2. Show on plan required signs, including Stop signs (none required at T-intersections) street name signs, and no parking fire access signs within cul-de-sacs. If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov |
01/25/2019 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
01/28/2019 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | January 28, 2019 SUBJECT: Paving Plans Tres Pueblos Este T18PI00039, I-2018-023 PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments and return redlined drawings with subsequent submittal. 1. Include the plan number “I-2018-023” in the title block of each sheet. 2. Include the PIA activity number “T18PI00039” on cover sheet. 3. Sheets 2 through 9: Remove signatory titles from title blocks. 4. Sheet 1, General Paving Note 8: Revise note to indicate the use of TDOT Mix No. 2 for the asphaltic concrete. 5. Sheet 2 & 8: Call out standard detail for new to existing curb and sidewalk connections at Tucson Blvd. and Bilby Rd. 6. Call out all proposed curb access ramps and indicate type. 7. Call out all proposed sidewalk scuppers. 8. Provide all details in this plan set for all proposed storm drain crossings proposed in the public right-of-way. Private drainage easement will need to be obtained for the private storm drains in the ROW. 9. Sheet 9, Section A: Per TSM 2-01.9.0 a minimum 2’ setback is required from top/toe of slope and property line. 10. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
02/28/2019 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Reqs Change | |
03/08/2019 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | Please submit utility notification confirmation for the utility companies listed on the PIA utility notification list. The list can be found at: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Jan14z.pdf |
03/08/2019 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Reqs Change | |
03/08/2019 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | Please submit utility notification confirmation for the utility companies listed on the PIA utility notification list. The list can be found at: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Jan14z.pdf |
03/08/2019 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Reqs Change | |
03/08/2019 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Reqs Change | |
03/08/2019 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Reqs Change | |
03/08/2019 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Reqs Change | |
03/08/2019 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Reqs Change | |
03/08/2019 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Reqs Change | |
03/08/2019 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Reqs Change |