Plan Number: T18PI00023
Parcel: Unknown

Address:
1101 E MABEL ST

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T18PI00023
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/27/2018 ERNIE ENCINAS DOT_ELEC REVIEW Reqs Change Modify notes to reflect electric shop contact shall be Armando Bracamonte 2791-3154 AND CONTACT 48 HRS MINIMUM PRIOR TO STARTING WORK plus traffic signal notes.
09/10/2018 GARY WITTWER DOT LANDSCAPE REVIEW Approv-Cond 1. I thin that the Agave havardiana is too large to go between the curb and sidewalk. Need to be set back of sidewalk at least 4'.
2. Appears that you are proposing 1/2" screened DG between curb and sidewalk. May have wash out on Park.
3. Is any of the planting on the north side of Mable required planting by DSD? (is the 10 bufferyard - 5' into the ROW?
4. Please add that "Standard Notes for Planting in ROW". Let me know if you don't have them.
09/10/2018 RLEIGH1 DOT MAPS & RECORDS REVIEW Reqs Change Comments By Marina Popkow, E.I.T., TDOT Traffic Engineering


I have reviewed your TIA and request for a left turn arrow at Speedway and Park, in conjunction with the U of A Honors College project. We would request that numbers for Left turn Warrant Analysis be found through real world analysis and not through simulation. Furthermore, the warrants must be met with current traffic numbers and not future predictions. If the analysis is done in this way and a warrant is met we can re-review your plans for installing left turn arrows at this location. Until then, based on your current numbers a left turn arrow is not warranted at this location.

Please let me know if you have any questions.

Thank you,
Marina Popkow, E.I.T.
Desk: (520) 837-6678
Cell: (520) 260-5330
Senior Engineering Associate
TDOT - Traffic Engineering
09/10/2018 ZELIN CANCHOLA DOT TRAFFIC REVIEW Approved
09/10/2018 RICHARD LEIGH DOT ENGINEERING REVIEW Reqs Change September 10, 2018

SUBJECT: Offsite Improvements Plans for University of Arizona Honors College

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval at this time. The following comments need to be addressed prior to in the subsequent review submittal. Please return redlined drawings with next submittal.

1. Use TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering.

2. Include the plan number "U-2018-009" in the title block of each sheet.

3. Include PIA activity number "T18PI00023" on cover sheet.

4. Include Development Plan number on cover sheet (if applicable).

5. Verify that all curb access ramps have an unobstructed and sized ramp landings per Technical Standards Manual (TSM) 10-01.4.3.

6. Provide stationing and offsets for proposed structures.

7. Label beginning/ending of pavement mill and inlay areas.

8. Sheet 5: Provide complete details for the proposed sidewalk scupper on Drachman Street east of Fremont Avenue.

9. Sheet 5: The sidewalk along Drachman St and Mable St at Fremont Ave exceed the maximum allowable lateral transition per TSM 10-01.3.3.D.1.d. Revise as needed.

10. Sheet 6: Verify section callout on Mable St, B/11 is for the cross walk section.

11. Sheet 8: Clarify where pavement replacement and mill and inlay will end at the intersection of Hellen St and Freemont Ave.

12. Sheet 8: Provide details for lighting fixtures along Fremont Ave between Hellen St and Mable Ave.

13. Sheet 11, Detail B: Indicate thickness of concrete base and provide specifications for latex based mortar.

14. Sheet 13, detail Y: Truncated domes are not required in the channelizing island.

15. Sheet 13, detail Y: Indicate thickness of sidewalk at trash receptacle driveway.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov.
09/18/2018 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Denied
09/18/2018 JIM FEMLING DOT STREET MAINTENANCE REVIEW Denied September 18, 2018

What happens to Fremont St between Mabel and Drachman, do we still own the ROW or is it conveyed to the University? Who is responsible for the maintenance? Second I would like to see all mill and overlays and all new road pavement to be a minimum of 3" thick. I did not see any existing or future grades on the plans, have ponding issues at curb ramps and intersections been looked at, off site drainage been addressed.

James Femling
Streets & Traffic Maintenance Superintendent
520-837-6778 (office) 520-488-7849 (mobile)
09/18/2018 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
09/18/2018 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Denied
09/18/2018 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Denied
09/18/2018 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
09/18/2018 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Denied
09/18/2018 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
09/18/2018 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Denied
09/18/2018 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Denied
10/24/2018 FSHENK1 PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
10/24/2018 FSHENK1 PIA COORDINATOR OUT TO CUSTOMER Completed