Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T18PI00018
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/23/2018 | TWOLFGA1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
07/23/2018 | TWOLFGA1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
07/23/2018 | TWOLFGA1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
07/23/2018 | TWOLFGA1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
07/23/2018 | TWOLFGA1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
07/23/2018 | TWOLFGA1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
07/23/2018 | TWOLFGA1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
07/23/2018 | TWOLFGA1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
07/23/2018 | TWOLFGA1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
07/31/2018 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
08/30/2018 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | August 29, 2018 SUBJECT: Offsite Improvements for 4th Street and 4th Ave PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval at this time. The following comments need to be addressed prior to in the subsequent review submittal. Please return redlined drawings with next submittal. 1. Use TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering. 2. Include the plan number "U-2018-007" in the title block of each sheet. 3. Include PIA activity number "T18PI00018" on cover sheet. 4. Include Development Plan number on cover sheet. 5. Sheet 1: Add the following Grading and Paving note: "The Contractor shall comply with Sun Link's Standard Operating Procedures when working within or near the Sun Link Streetcar Operational Right-of-way. Contact Sun Link Streetcar Operations (520) 791-3331 for Track Access Training and permitting requirements." 6. Sheet 2: Verify and correct all keynote sheet references. 7. Sheet 2: Clearly indicate proposed sidewalk widths. 8. Sheet 2: Indicate that the proposed sidewalk scuppers will extend a minimum of 1' beyond the sidewalk. 9. Sheet 3: Indicate the placement of "Back in Only" parking signs for new parking areas. Contact Park Tucson sign placement requirements. 10. Sheet 2: Provide additional spot grades between 13+22. Lt. and 13+35 Lt. to ensure positive drainage in this area. 11. Sheet 3 Provide striping details for parking layout. 12. Provide hardscape and landscaping details within the public right-of-way. 13. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov. |
09/21/2018 | TWOLFGA1 | DOT MAPS & RECORDS | REVIEW | Completed | |
09/21/2018 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Completed | |
09/21/2018 | TWOLFGA1 | DOT PERMITS & CODES | REVIEW | Denied | I have reviewed this plan and have the following comments: 1. Given the heavy pedestrian usage in this area why didnt you go with 6' wide sidewalk? 2. Sheet 3 - Note 23 This note should call out the usage of City of Tucson Mix #2 - TDOT#2. No further commerts Lance Peterson, P.E. 520-837-6777 |
09/25/2018 | TWOLFGA1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
09/25/2018 | TWOLFGA1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |