Plan Review Detail
Review Status: Completed
Review Details: PIA - RESUBMITTAL
Plan Number - T18PI00017
Review Name: PIA - RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/27/2018 | LINZUNZA | DOT ENGINEERING | REVIEW | Approv-Cond | September 27, 2018 SUBJECT: Houghton Town Center - Phase 2 2nd Review PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and recommends a conditional approval. The following comments need to be addressed and plans revised prior to submitting mylars for final approval. Please submit, via email, a PDF copy of the revise drawings prior to submitting mylars. 1. Use TDOT Engineering plan template for this plan set. Title block will need to be revised by removing "Transportation Planning" with "Streets and Traffic Maintenance". The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
| 09/27/2018 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
| 09/27/2018 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
| 09/27/2018 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
| 09/27/2018 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
| 09/27/2018 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
| 09/27/2018 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
| 09/27/2018 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
| 09/27/2018 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
| 09/27/2018 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
| 09/27/2018 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
| 09/27/2018 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
| 09/28/2018 | LINZUNZA | DOT_ELEC | REVIEW | Approv-Cond | Revise plans to reflect the following on sheet 2 of 4: 1. Note 11 should reflect relocation of pole and pullbox , similar to note 4. 2. No conduit in street should be reused. Intercept existing conduit in undisturbed area, reroute and extend conduit along with new conductors, behind new curb and reconnect relocated street lights. This is typical of both ends of the area being modified. Thanks, Ernie Encinas 837-6782 |