Plan Number: T18PI00017
Parcel: Unknown

Review Status: Completed

Review Details: PIA - RESUBMITTAL

Plan Number - T18PI00017
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/27/2018 LINZUNZA DOT ENGINEERING REVIEW Approv-Cond September 27, 2018

SUBJECT: Houghton Town Center - Phase 2 2nd Review

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and recommends a conditional approval. The following comments need to be addressed and plans revised prior to submitting mylars for final approval. Please submit, via email, a PDF copy of the revise drawings prior to submitting mylars.


1. Use TDOT Engineering plan template for this plan set. Title block will need to be revised by removing "Transportation Planning" with "Streets and Traffic Maintenance". The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering.

Please Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
09/27/2018 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
09/27/2018 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Completed
09/27/2018 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed
09/27/2018 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
09/27/2018 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
09/27/2018 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
09/27/2018 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
09/27/2018 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Completed
09/27/2018 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
09/27/2018 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
09/27/2018 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
09/28/2018 LINZUNZA DOT_ELEC REVIEW Approv-Cond Revise plans to reflect the following on sheet 2 of 4:

1. Note 11 should reflect relocation of pole and pullbox , similar to note 4.

2. No conduit in street should be reused. Intercept existing conduit in undisturbed area, reroute and extend conduit along with new conductors, behind new curb and reconnect relocated street lights. This is typical of both ends of the area being modified.


Thanks,
Ernie Encinas
837-6782