Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T18PI00017
Review Name: PIA - SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/24/2018 | TWOLFGA1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
| 08/07/2018 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Completed | |
| 08/07/2018 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | July 20, 2018 SUBJECT: Houghton Town Center Phase 2A Offsite Improvements PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval at this time. The following comments need to be addressed prior to in the subsequent review submittal. Please return redlined drawings with next submittal. 1. Use TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering. 2. Include the plan number "U-2018-005" in the title block of each sheet. 3. Include PIA activity number "T18PI00017" on cover sheet. 4. Include Development Plan number on cover sheet. 5. Sheet 2: Locate proposed curb access ramp on the east side of driveway to be more in line with ramp across driveway. 6. Sheet 4:, Detail A: Provide a geotechnical analysis supporting proposed pavement section or use pavement structural section "1" called out in Houghton / Old Vail Road Intersection Improvements plans I-2009-003 Sheet 9 of 108. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov. |
| 08/07/2018 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
| 09/04/2018 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Needs Review | |
| 09/04/2018 | TWOLFGA1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
| 09/04/2018 | TWOLFGA1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 09/04/2018 | TWOLFGA1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
| 09/04/2018 | TWOLFGA1 | PIA COORDINATOR | OUT TO CUSTOMER | Denied | |
| 09/04/2018 | TWOLFGA1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
| 09/04/2018 | TWOLFGA1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
| 09/04/2018 | TWOLFGA1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
| 09/04/2018 | TWOLFGA1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
| 09/04/2018 | TWOLFGA1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
| 09/04/2018 | TWOLFGA1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied |