Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T18PI00013
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/10/2018 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Denied | April 30, 2018 SUBJECT: Valencia Crossing PIA Plan T13PI00016 PROJECT REVIEWER: Zelin Canchola, DOT Review Section RESUBMITTAL REQUIRED: DOT Review Section has reviewed the PIA Plan for Traffic Engineering. Resubmit with the following 1. List quantities and descriptions for striping materials including number and type of RPM's, lineal footage quantities of longitudinal and traverse striping arrows, words and symbols. 2. Show marking details and symbol legends according to pavement marking standards. If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov |
05/10/2018 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | May 10, 2018 SUBJECT: Interim Roadway Improvements Plans for Valencia Crossing Infrastructure PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval at this time. The following comments need to be addressed prior to in the subsequent review submittal. Please return redlined drawings with next submittal. 1. Include the plan number "I-2018-008" in the title block of each sheet. 2. Remove PIA activity number "T13PI00016"on cover sheet and replace with"T18PI00013. 3. Revise plan tile to include the word interim. 4. Sheet 2: Provide complete details for the proposed storm drain located at +/-70+00 (Valencia Crossing Dr). Include inlet and outlet structures, inverts and class of pipe. Also, provide a section of it. 5. Sheet 2: Provide details for the rock rip-rap pad at the north end of Valencia Crossing Dr. 6. Sheet 2 & 3: indicate the final surface treatment and preparation requirements for the section of the roadway that will graded and not paved. 7. Provide a section showing the future roadway section and reference plan number I-2013-017 8. Submit a drainage report/statement and hydraulic analysis supporting the interim roadway infrastructure. 9. Provide a pedestrian circulation path pursuant to T.S.M. 7-01.3.3.a along Valencia Crossing Dr to Valencia Rd or pursue relief from requirement via a TSMR. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
06/01/2018 | LPETERS2 | DOT PERMITS & CODES | REVIEW | Denied | I have reviewed this plan and have the following comment: Sheet 1 - Note 5 - This note should state," Asphalt concrete shall conform to City of Tucson Mix #2". No further comments. Lance Peterson, P.E. 520-837-6777 |
06/11/2018 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | APPROVED - DUE TO NO RESPONSE AFTER NUMEROUS REQUESTS. |
06/11/2018 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
06/11/2018 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
12/12/2018 | TWOLFGA1 | DOT ENGINEERING ADMINISTRATOR | REVIEW | Completed |