Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T18PI00004
Review Name: PIA - SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/25/2018 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Please identify where the NPPO - TOS trees will be relocated on the landscape plan and how they will be irrigated. |
| 02/13/2018 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | February 13, 2018 SUBJECT: T18PI00004 (I-2008-004) PROJECT REVIEWER: Zelin Canchola, TDOT Review Section RESUBMITTAL REQUIRED: DOT Review Section has reviewed the PIA Plan for Traffic Engineering. The proposed plan requires the following change: Sheet 2 0f 2: 1. Add - General Notes for Striping. Add Pima County/City of Tucson striping notes to be included on the general notes sheet or separate striping plan sheet. 2. No arrows for turn lane required. 3. Add - Show quantities of new striping. 4. Add - Add edge line stripe at edge of new pavement. (WS6) 5. Add - Add striped gore north of turn lane. 6. Change (typo) 4DS4 to YDS4 7. It is unclear how new pavement for southbound traffic will transition to the existing lane. Show transition and any new striping. If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov |
| 02/21/2018 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
| 02/21/2018 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | February 16, 2018 SUBJECT: Dollar General - Wilmot Turn Lane Plan PROJECT REVIEWER: Richard Leigh, TDOT Engineering Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to final approval. Please include a response letter addressing the following comments and return any redlined drawings with subsequent submittal. 1. Sheet 1: Include the plan number "U-2018-002" in the title block of each sheet. 2. Sheet 1: Include the PIA activity number "T18PI00004" on cover sheet. 3. Add a title at top of cover sheet. 4. Note the activity number associated with the development on cover sheet. 5.Sheet 1: Paving note 1: Remove "(PC/COT SSPI) 2011" and replace with "2015". 6. Sheet 1 Paving note 12: Revise phone number for Paul Rosenboom to 520-791-3154 . 7. Provide a minimum of 8 feet wide graded pedestrian area at 2% max cross slope and be separate to drainage swale, alongside of the proposed strip paved pavement widening along Wilmot Rd. 8. Does the utility poles proximity to the proposed new edge of the traveled way meet AASTO clear zone guidelines for the existing roadway speeds? 9. Sheet 2: Provide a dimensioned detailed section of the roadway at the full widening and depict and label the ROW limits, edge of pavement, and travel and turn lanes. 10. Please Refer to redline drawings for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
| 02/21/2018 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
| 02/21/2018 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
| 02/21/2018 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
| 02/21/2018 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
| 02/21/2018 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
| 02/21/2018 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
| 02/21/2018 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
| 02/21/2018 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
| 02/23/2018 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
| 02/23/2018 | LINZUNZA | DOT PERMITS & CODES | REVIEW | Denied | Additional information needed. |
| 02/23/2018 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 02/23/2018 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |