Plan Number: T18PI00003
Parcel: Unknown

Review Status: Completed

Review Details: PIA - RESUBMITTAL

Plan Number - T18PI00003
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/19/2018 TWOLFGA1 UTILITY CLEARANCES COT STREETS DIVISION Completed
03/19/2018 TWOLFGA1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
03/19/2018 TWOLFGA1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
03/19/2018 TWOLFGA1 UTILITY CLEARANCES COX COMMUNICATION Completed
03/19/2018 TWOLFGA1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
03/19/2018 TWOLFGA1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
03/19/2018 TWOLFGA1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
04/16/2018 ZELIN CANCHOLA DOT TRAFFIC REVIEW Approved
04/16/2018 RICHARD LEIGH DOT ENGINEERING REVIEW Approv-Cond April 16, 2018

SUBJECT: Offsite Paving Plans For University Commons at Feldman's - Phase 1 (2nd Review)

PROJECT REVIEWER: Richard Leigh, TDOT Engineering Review

RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and recommends a conditional approval. The following comments need to be addressed and plans revised prior to submitting mylars for final approval. Please submit, via email, a PDF copy of the revise drawings prior to submitting mylars.

1. Sheet 3: Indicate pavement patching details for proposed utility trenches if work will be done under the PIA or indicate that the work will be done under a separate permit.

2. Sheet 3: Truncated domes are not warranted within the proposed channelizing island at the driveway entrance located at +/- 11+31, RT (6th Ave), revise as needed.

3. Sheet 3: Provide a curb access ramp per PAG Std. Dtl. Type 1 or similar, revise as needed.

If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov.
04/19/2018 LPETERS2 DOT PERMITS & CODES REVIEW Approved
04/25/2018 TWOLFGA1 PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
04/25/2018 TWOLFGA1 UTILITY CLEARANCES QUEST COMMUNICATION Approved
04/25/2018 TWOLFGA1 PIA COORDINATOR OUT TO CUSTOMER Completed
04/25/2018 TWOLFGA1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Approved