Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T18PI00003
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/22/2018 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
02/01/2018 | LPETERS2 | DOT PERMITS & CODES | REVIEW | Denied | I have reviewed this plan and have the following comments: 1. Sheet 2 - It appears that you are proposing to add two feet of concrete to an existing sidewalk. Has the condition of the existing sidewalk been reviewed. A better finished product would be to construct new sidewalk of the proper width. 2. Please call out the slope between curb acess ramps(across driveways) need to be ADA compliant. 3. Looking at Sheet 1, the project limits are not clearly defined. It appears that this phase only pertains to the Speedway frontage. No further comments. Lance Peterson, P.E. 520-837-6777 |
02/06/2018 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | February 6, 2018 SUBJECT: T18PI00003 (I-2008-003) PROJECT REVIEWER: Zelin Canchola, TDOT Review Section RESUBMITTAL REQUIRED: DOT Review Section has reviewed the PIA Plan for Traffic Engineering. The proposed plan requires the following change: Sheet 3 0f 4: 1. Add - Bicycle Lane along frontage of proposed development. 2. Add - Show new striping and call out size and type. 3. Add - Show quantities of new striping. 4. Add - Add sign "Begin Right Turn Lane Yield to Bikes. If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov |
02/07/2018 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | February 5, 2018 SUBJECT: Offsite Paving Plans For University Commons at Feldman's - Phase 1 PROJECT REVIEWER: Richard Leigh, TDOT Engineering Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to final approval. Please include a response letter addressing the following comments and return any redlined drawings with subsequent submittal. 1. Sheet 1: Include the plan number "U-2018-001" in the title block of each sheet. 2. Sheet 1: Include the PIA activity number "T18PI00003" on cover sheet. 3. Sheet 1, Revise Paving Note 4 to indicate City of Tucson "City Mix" asphalt Mix #2. 4. Sheet 1 Paving note 14: Revise phone number for Paul Rosenboom to 520-791-3154 . 5. Include all roadway improvements along 6th Avenue in this plan set. 6. Sheet 2: Pursuant to the COT Uniform Development Code Technical Standards Manual Section 10-01.3.3, indicate the removal and replacement of existing sidewalk between Sta. 15+50 Lt and 11+70 Lt (Speedway Boulevard). Existing sidewalk does not meet current ADA requirements. 7. Remove post barricade in front of bus stop to provide a barrier-free pedestrian route. 8. Sheet 2: Pursuant to the COT Uniform Development Code Technical Standards Manual Section 10-01.3.3, indicate the removal and replacement of the curb access ramp located at the northeast corner of Speedway Boulevard and 6th Avenue. 9. Clearly indicate that the cross slope of the crosswalk area across the driveways shall not exceed 2%. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
02/13/2018 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
02/13/2018 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
02/13/2018 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
02/13/2018 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
02/13/2018 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
02/13/2018 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
02/13/2018 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
02/13/2018 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
02/13/2018 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
02/23/2018 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
02/23/2018 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
02/23/2018 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |