Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - RESUBMITTAL
Plan Number - T18PI00001
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/28/2018 | TWOLFGA1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
03/28/2018 | TWOLFGA1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
03/28/2018 | TWOLFGA1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
03/28/2018 | TWOLFGA1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
03/28/2018 | TWOLFGA1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
04/04/2018 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | April 4, 2018 SUBJECT: La Estancia Phase 2 T18PI00001 (I-2008-001) PROJECT REVIEWER: Zelin Canchola, TDOT Review Section RESUBMITTAL REQUIRED: DOT Review Section has reviewed the PIA Plan for Traffic Engineering. The proposed plan requires the following change: 1. Add - Sign summary sheet as noted on note 3 (signing notes) 2. Modify sign notes - Note 6 eliminate "All type XI sign sheeting material to be manufactured by 3M Corp. Or approved equal as directed by the Town Engineer or designee." Note 11. Change to "City of Tucson Traffic Engineering 520 791 04259" 3. No stop sign required at T-intersection Sheet 8 of 8 If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov |
04/05/2018 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approved | |
04/09/2018 | LPETERS2 | DOT PERMITS & CODES | REVIEW | Approved | |
04/25/2018 | TWOLFGA1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
04/25/2018 | TWOLFGA1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
04/26/2018 | TWOLFGA1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
04/26/2018 | TWOLFGA1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
05/10/2018 | TWOLFGA1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
05/10/2018 | TWOLFGA1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed |