Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM10048
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/07/2019 | GPERU1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 01/07/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
| 01/07/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide a complete one line diagram as outlined per the City Of Tucson Commercial Plan Submittal Requirements for electrical plan submittal. These requirements can be printed or downloaded from www.tucsonaz.gov/pdsd. Also be advised that if the electrical designs exceeding 400 amps or 22,000 AIC, it will require an Electrical Engineer registered in the state of Arizona to design and seal the electrical plans. #2. Provide the following information; (a) Voltage, Phase, Amp, AIC ratings and load calcs of the service and all associated equipment. (b) Verify the existing electrical service is fed overhead by the utility. Otherwise, the new service must be fed underground by the serving utility. (c) Assign branch circuits and panel numbers for the devices and luminaires. Ref; 2012 IBC sec 107.2.1 and amendments, 2011 NEC, City Of Tucson Commercial Plan Submittal Requirements for electrical plan submittal. Arizona Revised Statutes. |
| 01/07/2019 | GPERU1 | FIRE | REVIEW | Needs Review | |
| 01/07/2019 | GPERU1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
| 01/07/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 01/07/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
| 01/08/2019 | MCASTRO2 | ENGINEERING | REVIEW | Needs Review | |
| 01/08/2019 | MCASTRO2 | ZONING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/22/2019 | AMARTIN1 | APPROVAL SHELF | Completed |