Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM09905
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/15/2019 | MASHFOR1 | FIRE | REVIEW | Approved | |
| 01/17/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 01/23/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 01/23/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 01/23/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify how the zones used for the cooling/heating load calculations can be compared to the capacities for the split system heat pumps. 2. Provide structural details to show how the fan coil units are to be connected to the building structure. Reference: Section 302.1, IMC 2012. 3. Verify that maintenance access, lighting, and a receptacle outlet are provided for each fan coil unit located in the interstitial space of a floor-ceiling assembly (e.g. above a hard ceiling). Reference: Sections 306.4 and 306.4.1, IMC 2012. 4. Show the size, routing, and termination of the condensate drains. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson. |
| 02/05/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Please verify that the fan coil units installed above the hard lids have a switched lighting outlet for servicing the unit as required per NEC 210.70A(3). If not, please provide a circuit and switched lighting outlet. Ref; 2011 NEC. |