Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T18CM09841
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/04/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 02/11/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 02/20/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 02/20/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 02/22/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | The COMcheck analysis uses humidity-control requirements as a reason for not installing economizers. What are the humidity-control requirements for restaurants and mercantile occupancies? Identify which compliance path the HVAC design is using, simplified or mandatory. Reference: Section 6.2.1, ASHRAE 90.1-2010. [Initial comment: The architect has selected ASHRAE 90.1-2010 as the method for showing compliance with the adopted energy code. Provide calculations that demonstrate compliance with the HVAC requirements of ASHRAE 90.1-2012 (e.g. COMcheck). Reference: Section C401.2 (1), IECC 2012.] |
| 02/27/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: 2502 E Grant Road - Food Service and Retail Uses Development Package (2nd Review) related to DP18-0195 T18CM09841 - C-1 / C-2 Zoning TRANSMITTAL DATE: February 27, 2019 DUE DATE: February 28, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the Building plans for compliance with the unapproved version of the development package. While the building footprint and the site revisions are consistent with the unapproved version of the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc.) zoning cannot approve the building plans until the Development Package DP18-0195 is approved. 2. COMMENT: Zoning will review the building plans on the next submittal to assure that any revisions made to the building plans do not affect zoning requirements and that all PDSD commercial plans reviewers have also approved the building plans. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: as noted above |
| 03/05/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | DP must be approved first. |