Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T18CM09766
Parcel: 140420780

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T18CM09766
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/14/2018 NICHOLAS ROSS ZONING REVIEW Approved
12/14/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
12/14/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Needs Review
12/14/2018 NROSS1 ENGINEERING REVIEW Passed
12/14/2018 GPERU1 BUILDING-COMMERCIAL REVIEW Reqs Change 1. Please specify whether the mezzanine is existing; wall section F1 indicates a new wall to the bottom of the mezzanine deck.
2. SHT A1.1 Keynote 7 specifies a new steel railing at the mezzanine; provide an elevation detail for use of the steel railing for a required personel guard rail.
3. Specify the intended use for the mezzanine and provide the occupant load. IBC TABLE 1004.1.2
4. A minimum of 2 exits or exit doors is required from a room or space with an occupant load of 50 or more, which would apply to the Training Roof with an occupant laod of 57 persons. IBC 1015.1
5. Indicate the common path of egress travel from the mezzanine level.IBC 1014.3
6. Show the vertical grab bar above the horizontal grab bar for the water closets in accordance with 604.5.1 ICC A117.1

Please provide written responses to all plan review comments.
12/14/2018 ROBERT SHERRY WATER REVIEW Completed
12/14/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Clarify the scope of the plumbing work (e.g. new, relocated, or replacement fixtures). Relocated fixtures and appliances or fixtures that are being installed in new locations will require the new or revised piping to be shown.
12/14/2018 GPERU1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
12/17/2018 MASHFOR1 FIRE REVIEW Approved