Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T18CM09732
Review Name: REVISION - - 1ST
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/24/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. [Initial comment: Demonstrate energy code compliance for the alterations to the building envelope and the addition of the new rooftop units. Reference: Sections C101.4.3, C101.5, C103.2, C303, and C401.2.1, International Energy Conservation Code 2012. 2. Comment not addressed. [Initial comment: Alterations of an existing building in which the existing ceiling or wall cavities are exposed, shall have the exposed cavities filled with insulation. Reference: Section 101.4.3, IECC 2012. 3. Comment not addressed. [Initial comment: Provide heating and cooling load calculations, using the exterior design conditions shown in Section C302.2, IECC 2012, as modified by the City of Tucson. 4. Comment not addressed. [Initial comment: Show the size, routing, and termination of the condensate drains for the new rooftop units. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson. 5. Comment not addressed. [Initial comment: Provide the size of the exhaust duct for the hood H-2. Reference: Section 107.2.1, IBC 2012. 6. Comment not addressed. [Initial comment: Coordinate the exhaust and make-up air flow rates shown on the grease hood schedule, exhaust fan ventilation schedule, make up air equipment schedule, and the mechanical plan. Reference: Section 107.2.1, IBC 2012. 7. Comment not addressed. [Initial comment: Detail 2/M2.0 is labeled as an existing hood. Isn't the hood new? Reference Section 107.2.1, IBC 2012. 8. Comment not addressed. [Initial comment: Provide structural details as required for any special framing revisions needed for the roof penetrations of the 20" x 18" exhaust ducts. Reference: Section 302.1, IMC 2012. 9. Comment not addressed. [Initial comment: Provide structural calculations to show that the Type I hood is supported from the building structure in accordance with Section 507.6, IMC 2012 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2012. 10. Comment not addressed. [Initial comment: The practice of using grease duct enclosure material (i.e. fire wrap blanket) to provide clearance to combustibles where a hood penetrates a ceiling has been specifically prohibited by Section 507.10, IMC 2012 because the grease duct enclosure material has not been listed for this use. See Section 506.3.11, IMC 2012 for the hood enclosure requirements. |
| 04/24/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. [Initial comment: Provide plumbing drawings that include the changes made to the men's restroom not included in the previously approved plans. Reference: Section 107.2.1, IBC 2012. 2. Comment not addressed. [Initial comment: Provide power for the new water heater. Reference: Sections 303.2 and 607.1, IPC 2012. 3. Comment not addressed. [Initial comment: The developed length of the hot water supply piping appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2012. 4. Comment not addressed. [Initial comment: Show how the discharge from the dish machine and the cooking appliances will be limited to 140 degrees Fahrenheit or less before entering the indirect waste receptor. Reference: Section701.7, IPC 2012. 5. Comment not addressed. [Initial comment: Provide separate indirect waste pipes for each compartment of the 3-compartment sink to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012. 6. Comment not addressed. [Initial comment: Verify that all of the new vents (except for vents serving interceptors located outdoors) rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2012 |
| 05/12/2020 | ARUIZ1 | BUILDING-COMMERCIAL | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/12/2020 | ARUIZ1 | OUT TO CUSTOMER | Completed |