Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T18CM09728
Parcel: 113071920

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T18CM09728
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/29/2019 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved
01/29/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
12/13/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Correct the size of the gas piping serving the gas-fired water heater anf the section of the gas piping downstream of the water heater take-off.
2. Provide a cleanout for the 4" building sewer.
3. Provide a 3" floor drain in the laundry area. Reference: Section 412.4, IPC 2012.
4. Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
5. Provide tempered water to the lavatory using a temperature mixing valve listed to ASSE 1070.
6. Provide water hammer arrestors for the hot and cold water supplies for the clothes washers.
12/13/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. This project is commercial not residential. Please remove residential references on the plan.
#2. Provide an electrical line diagram on the electrical plan. Show a complete panel schedule for the panel feeding the new panel A. Include OCPD size, conduit, conductor sizes and types for the feeder feeding panel A, location of the panel feeding panel A.
#3. Both receptacles in the restroom need to be GFI protected.
#4. Provide a description of the luminaire type in the lighting fixture table.
#5. Provide complete compliance with the 2012 Tucson/Pima County Outdoor Lighting Code for the exterior lighting. This Code can be printed or downloaded from www.tucsonaz.gov/pdsd. See section 104 for plan submittal requirements.
#6. Provide for a Grounding Electrode System at the new building as required per NEC art 250.32.
Ref; 2012 IBC sec 107.2.1, 2011 NEC
12/13/2018 NICHOLAS ROSS ZONING REVIEW Approved
12/13/2018 JVINCEN1 FIRE REVIEW Approved
12/13/2018 ROBERT SHERRY WATER REVIEW Completed
12/13/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide cooling/heating load calculations for the RTU.
2. Correct the COMcheck mechanical certificate using the specified unitary air conditioner rather than a packaged terminal air conditioner.
3. Provide ventilation calculations for the building. Reference: Section 403.3, IMC 2012.
4. Provide a sequence of operation for the restroom exhaust fan.
5. Provide safety railing for the rooftop AC.
6. Provide specifications and listing information for the rooftop AC.
12/13/2018 NROSS1 ENGINEERING REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
01/29/2019 AVAUGHN1 OUT TO CUSTOMER Completed