Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T18CM09728
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/29/2019 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 01/29/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 12/13/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Correct the size of the gas piping serving the gas-fired water heater anf the section of the gas piping downstream of the water heater take-off. 2. Provide a cleanout for the 4" building sewer. 3. Provide a 3" floor drain in the laundry area. Reference: Section 412.4, IPC 2012. 4. Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 5. Provide tempered water to the lavatory using a temperature mixing valve listed to ASSE 1070. 6. Provide water hammer arrestors for the hot and cold water supplies for the clothes washers. |
| 12/13/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. This project is commercial not residential. Please remove residential references on the plan. #2. Provide an electrical line diagram on the electrical plan. Show a complete panel schedule for the panel feeding the new panel A. Include OCPD size, conduit, conductor sizes and types for the feeder feeding panel A, location of the panel feeding panel A. #3. Both receptacles in the restroom need to be GFI protected. #4. Provide a description of the luminaire type in the lighting fixture table. #5. Provide complete compliance with the 2012 Tucson/Pima County Outdoor Lighting Code for the exterior lighting. This Code can be printed or downloaded from www.tucsonaz.gov/pdsd. See section 104 for plan submittal requirements. #6. Provide for a Grounding Electrode System at the new building as required per NEC art 250.32. Ref; 2012 IBC sec 107.2.1, 2011 NEC |
| 12/13/2018 | NICHOLAS ROSS | ZONING | REVIEW | Approved | |
| 12/13/2018 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 12/13/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 12/13/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide cooling/heating load calculations for the RTU. 2. Correct the COMcheck mechanical certificate using the specified unitary air conditioner rather than a packaged terminal air conditioner. 3. Provide ventilation calculations for the building. Reference: Section 403.3, IMC 2012. 4. Provide a sequence of operation for the restroom exhaust fan. 5. Provide safety railing for the rooftop AC. 6. Provide specifications and listing information for the rooftop AC. |
| 12/13/2018 | NROSS1 | ENGINEERING | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/29/2019 | AVAUGHN1 | OUT TO CUSTOMER | Completed |