Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM09506
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/05/2018 | ELISA HAMBLIN | ZONING | REVIEW | Approved | |
| 12/05/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a COMcheck envelope compliance report for the building alteration. 2. Provide heating/cooling load calculations for the new fan coil units. |
| 12/05/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide a GFI protected receptacle for HP Maintenance per NEC 210 .63. #2. Provide a switched luminaire above the ceiling for the FC units per NEC 210.70 (c). |
| 12/05/2018 | EHAMBLI1 | ENGINEERING | REVIEW | Passed | |
| 12/05/2018 | GPERU1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Please review the construction type that has been designated for the building; type III-B construction specifies a fire resistance rating of 2-hr fire resistance rating for exterior walls. IBC TABLE 601 2. Verify the type of construction for the building as type II-B or VB construction. IBC TABLE 601 3. Provide a construction detail for the in-fill portion of the building; specify anchorage of the wall to the slab. IBC 107.2.1 4. Provide a construction of the furr-out wall; indicate anchorage to the slab and existing walls. IBC 107.2.1 5. Two (2) sets of plans are required. Please provide written responses to all comments. |
| 12/05/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 12/05/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 12/05/2018 | GPERU1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 12/05/2018 | EHAMBLI1 | LANDFILL | REVIEW | Passed | |
| 12/06/2018 | MASHFOR1 | FIRE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/18/2018 | QJONES1 | APPROVAL SHELF | Completed |
| 12/18/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
| 12/18/2018 | QJONES1 | REJECT SHELF | Completed |