Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T18CM09404
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/12/2019 | ALEXANDRA HINES | PLANNING-CITY HALL | REVIEW | Needs Review | |
12/10/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. CMU WALL Page 6 of the Geotechnical Report lists the Allowable Soil Bearing Capacity at #1500 at a bearing depth of 2.0-3.0 feet below final grade; the footing depth for the masonry wall must show a minimum of 2 ft. into undisturbed soil. IBC 1806.1 2. CMU WALL Please specify the vertical spacing of rebar at the 12" CMU retaining wall; vertical rebar spacing must be in accordance with structural calculations which specify #5 rebar at 8" o/c. See page #8 on Structural Calcs. 3. The TYPICAL CADWELD AND COMPRESSIONS DETAILS is too light to be legible, please submit a new sheet with all details legible. IBC 107.2.1. Please respond to all comments in writing. |
12/10/2018 | GPERU1 | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The TYPICAL CADWELD AND COMPRESSIONS DETAILS is too light to be legible, please submit a new sheet with all details legible. IBC 107.2.1. |
12/20/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T18CM09404 - Communications Use New Mono-Palm Cell Tower (1st Review) 1010 E. 9th Street - Verizon - C-1 / R-2 Zoning TRANSMITTAL DATE: December 20, 2018 DUE DATE: December 20, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Address the following Zoning comments: 1. COMMENT: After reviewing the plans zoning has found that the submitted building plans are in substantial compliance with the PDP and Procedural / Land Use Compatibility - Concealment Measures as it relates to the zoning review purview. However the plans must first be reviewed and stamped by Peter McLaughlin Community Planning Section. 2. COMMENT: Contact Peter McLaughlin at 520-837-4898 or Peter.McLaughlin@tucsonaz.gov if you have any questions related to his review. 3. COMMENT: Label the size of the block used for the Compound wall. The minimum width required by the Concealment Methods is 6 inches. 4. Review the PDSD Engineering review comments for additional requirements for a DP Site and /Grading Plan Submittal. 5. COMMENT: It appears that the wrong address has been used for the cell tower application. The Parcel on which the tower is to be located is addressed 1050 E. 9th Street. 6. COMMENT: Once the plans have been approved and signed by Peter and the PDSD commercial plans reviewers. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov |
12/20/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Denied | T18CM09404 1) A separate development plan (DP) must be applied for and submitted for review due to changes to site grading and drainage 2) In the development plan it must be clearly shown and stated that the capacity of the existing retention basin is not impacted 3) Approval of the DP is required prior to approval of the building plans John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
12/28/2018 | AMARTIN1 | COMMUNICATIONS | REVIEW | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/14/2019 | AVAUGHN1 | APPROVAL SHELF | Completed |
02/14/2019 | AVAUGHN1 | OUT TO CUSTOMER | Completed |
02/14/2019 | AVAUGHN1 | REJECT SHELF | Completed |