Permit Review Detail
Review Status: Completed
Review Details: WALK THRU - COMM
Permit Number - T18CM09208
Review Name: WALK THRU - COMM
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/26/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a design for the fan coil mounting shelf noted on sheet M2.1. 2. Provide a sequence of operation for the refrigerant detection, ventilation, and emergency shut-off system for the mechanical room. 3. Provide fire safing for the pipe penetrations of the floor-ceiling assembly. |
11/26/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Revise detail 8/M4.1 to show the shut off valve located upstream of the dirt leg. Reference: Section 408.4, IFGC 2012. |
11/26/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide a detailed wiring diagram and show wiring methods to indicate the installation and operation of the Emergency Power Off buttons for the equipment. #2. Indicate any new wiring required for the installation of the mechanical equipment. Ref; 2012 IBC sec 107.2.1, 2011 NEC art 300, City Of Tucson Commercial Plan Submittal Requirements (Electrical) www.tucsonaz.gov/pdsd. |
11/26/2018 | MARTIN BROWN | FIRE | REVIEW | Approved |