Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM08996
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/13/2018 | NICHOLAS ROSS | ZONING | REVIEW | Needs Review | ZONING REVIEW TRANSMITTAL FROM: Nick Ross Lead Planner PROJECT: T18CM08996 5373 S. Calle Santa Cruz 101 TI - Renovation TRANSMITTAL: November 13, 2018 COMMENTS: the following comments are relative to an application for a Special Exception Process (UDC 3.4.2). This site is located in the C-3 zone (UDC 4.7.22). A non-chartered financial institute is a permitted use in this zone (Table 4.8-4) with a special exception subject to use specific standards 4.9.4.L4. |
11/13/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide calculations to show how ventilation will be provided for the occupied spaces. Reference: Section 401.2, IMC 2012. 2. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). Reference: Section 403.2.1 (4), IMC 2012. |
11/13/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comment. Also provide a written response. #1. Ref; Plan Sheet E200. The mechanical schedule shows an electrical water heater. However it is not included in the electrical floor plan, panel schedule or calcs. Please clarify. Ref; 2012 IBC sec 107.2.1, 2011 NEC art 408.4. |
11/13/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
11/13/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
11/13/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. 3. Clarify how the drinking fountain will be able to serve bot standing and handicapped users. Reference: Section 410.2, IPC 2012. |
11/13/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/30/2018 | SVALENZ1 | ENGINEERING | REVIEW | Needs Review | |
11/30/2018 | SVALENZ1 | FIRE | REVIEW | Needs Review |