Permit Number: T18CM08710
Parcel: 12004002B

Review Status: Completed

Review Details: 3RD PARTY REVIEW - COMMERCIAL

Permit Number - T18CM08710
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/04/2018 MASHFOR1 FIRE REVIEW Approved Deferred submittal will be supplied to Fire per the plans for added sprinkler and alarm
12/04/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change T18CM08710

T18CM08710
1) Engineering has reviewed the building plans and they do not match the approved development package (DP16-0044). Particularly the sidewalks around the perimeter of the building. Update the building plans or DP as needed
2) Coordinate with Development Package (DP) to ensure that roof drains scupper underneath sidewalks. Reference City of Tucson Technical Standards Manual (TSM) section 7-01.4.1.E
3) Once the DP has been approved and any outstanding commercial review comments have been addressed, Engineering can conduct an over the counter review of the building plans. Call or Email to Schedule


John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
12/04/2018 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T18CM08710
Building Plan Review (1st Review)
4830 S. Calle Santa Cruz

TRANSMITTAL DATE: December 3, 2018

DUE DATE: December 3, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. COMMENT: Zoning has reviewed the Shell Building plans for compliance with the approved development package. While the building footprint is consistent with the DP as it relates to the zoning review purview Building footprint, Height, square footage, site conditions etc., zoning cannot approve the building plans until the 3rd Party and PDSD Commercial Plans reviewers have approved the building plans.

2. COMMENT: Zoning reviewed the building site plan included in the building package for consistency with the approved DP. It appears that the building package site plan does not match the approved site plan. The site plan in the building package must be revised to match the DP site plan or vice versa.

The sidewalk area along the west side of the building in the DP package does not appear to be ADA compliant as the door(s) open directly over the sidewalk. However on the building package site plan the sidewalks that abut the vehicle parking spaces must 6.5 feet wide that allows for a 2.5-foot overhang and a four foot clear walk way area or include wheel stops to keep vehicles from overhanging the sidewalks. There is sufficient area to increase the width to 6.5 feet or add wheel stops. The location of the bicycle parking does not appear to be in the same location or is missing from the Building Package site plan etc. review the DP site plans and revise the building package site plan to match.

3. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage, location, and the building package site plan to ensure consistency with the DP.

4. COMMENT: Once the plans have been reviewed and approved by the 3rd Party and PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning.

5. COMMENT: It appears that the DP will also must be revised. Contact Steve Shields for information on the revision process.

If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Building Plans - Revised building package site plan
12/06/2018 ROBERT SHERRY WATER REVIEW Reqs Change Revise the site plan to show the location and size of the water meter and backflow preventer serving the building
12/14/2018 STANTEC 3RD PARTY REVIEW-COMMERCIAL AT 3RD PARTY OFFICE Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
12/14/2018 KROBLES1 OUT TO CUSTOMER Completed