Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/WWM
Permit Number - T18CM08645
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/WWM
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/08/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T18CM08645 New Family Dwelling (1st Review) 857 W, Idaho Street TRANSMITTAL DATE: November 8, 2018 DUE DATE: November 14, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: Zoning has reviewed the proposed building plans for the new single family dwelling development at 857 W. Idaho Street but cannot approve them at this time. Address the following comments and resubmit for review. 02. COMMENT: The existing parcel is greater in size and shape than has been depicted on the site plan. It is my understanding that the applicant may be pursuing a lot split approval. As of this building plan for the new SFR, a lot split application has not been processed. Zoning will not approve this permit application until the lot split application is processed, approved, recorded documents provided with the building plans as reference. As noted above the lot depicted on this plan does not match the recorded actual lot 16. If the applicant wishes to revise the site plan to match the existing lot with the current lot line dimensions and bearings as recorded in Map and Plat in Bk. 8 at Page 45, the applicant can obtain approval for a building permit assuming all zoning, engineering, NPPO and Building code requirements are met. The lot split can be processed afterwards once the first permit is approved. However a revised site plan for this development would be required once the lot split is processed. 03. COMMENT: Check the scale that has been used on the plan. It is listed as ΒΌ per foot but when scaling the drawing to verify the overall height of the gable end the dimensions did not scale what is labeled. Label the height of the gable end from design grade (ground to the bottom of the ridge) on the elevations drawings. 04. COMMENT: The plans will be reviewed again for compliance with lot coverage, setbacks etc. on the next submittal once it is clear what is to be processed. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans |
| 11/09/2018 | ANDREW CONNOR | NPPO | REVIEW | Reqs Change | The existing parcel is greater in size and shape than has been depicted on the site plan. Approval of this permit application will not occur until the lot split application is processed, approved, recorded documents provided with the building plans as reference. 7.7. NATIVE PLANT PRESERVATION 7.7.3. APPLICABILITY Single-family residential development on lots recorded after March 24, 1997. If new lot is created, then a NPPO plan or application for exception must be submitted for approval per: SECTION 2-11.0.0: NATIVE PLANT PRESERVATION PLAN REQUIREMENTS. Ensure that all Zoning & Engineering comments are addressed. |
| 11/14/2018 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Completed | |
| 11/30/2018 | LOREN MAKUS | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/05/2018 | QJONES1 | APPROVAL SHELF | Completed |
| 12/05/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
| 12/05/2018 | QJONES1 | REJECT SHELF | Completed |