Permit Number: T18CM08172
Parcel: 11811007B

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T18CM08172
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/19/2018 GPERU1 BUILDING-COMMERCIAL REVIEW Reqs Change 1. The Geotechnical Engineering Report cannot be the DRAFT version of the report. The engineer must seal the Geo Tech Roport. Reference plan review comment #11.
11/19/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Provide a lighting site plan showing all the exterior lighting on this parcel and identification that correlates with the lumen calcs, color temperatures.
#2. Ref; Revised Plan Sheet ES1.01. The color temperature for the 'F1' luminaire exceeds the max allowed of 3500K. Per lighting schedule on plan sheet E0.01.
Ref; OLC sec 402.1.
12/12/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change New notes on sheet A3.01 call for the overflow scuppers to be located 6" above the lowest point of the roof. Provide verification (I.e. calculations) from the structural engineer that the weight of the retained water will not over stress the roof structure. Reference: Sections 1611.1 and 1611.3, IBC 2012. [Initial comment: Provide overflow protection for the loading canopies, the entrance soffit, and the associates' entrance soffit. Reference: Sections 1101, 1106 and 1108, IPC 2012.]
12/12/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Explain why the proposed AC unit has a cooling capacity that is more than 11 MBH greater than the calculated cooling load. The next smaller model of the AC unit appears to have sufficient cooling capacity. [Initial comment: Provide heating and cooling load calculations for AC-1. Include AC-1 in the COMcheck Mechanical Compliance Certificate analysis. Reference: Section C403.2.1, IECC 2012.]
12/12/2018 ROBERT SHERRY WATER REVIEW Reqs Change The inclusion of sheet 9 answered the comment (include sheet 9 in the list of drawings on sheet G0.00) but plumbing plan 2/P1.01 has been revised to show the water meter and backflow preventer located in the sprinkler riser room. The water meter and backflow preventer are currently located as shown on sheet 9, where Tucson Water has access to the units. [Initial comment: Show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan; Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf.]
12/13/2018 AVAUGHN1 ENGINEERING REVIEW Needs Review
12/13/2018 AVAUGHN1 ZONING REVIEW Needs Review