Review Date Reviewer's Name Type of Review Description Status Comments
01/15/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Comment not addressed. [Second comment: There is only one junction of the building drain and the building sewer in this warehouse shell but sheet P1.1 shows three 2-way cleanouts. See the definitions for building drain and building sewer in Section 202, IPC 2012.] [Initial comment: An approved 2-way cleanout fitting is allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning in the direction of flow. Reference: Sections 708.3.5 and 708.5, IPC 2012.]
01/23/2019 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T18CM08145 - New Building (General Manufacturing) Related to DP18-0244
Building Plan Review (2nd Review) R & Y Enterprises LLC
3210 N. Freeway Industrial Loop - I-1 Zoning

TRANSMITTAL DATE: January 23, 2019

DUE DATE: January 24, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. COMMENT: Zoning has done a second review of the building plans for compliance with the current unapproved version of the development package. While the building footprint is consistent with the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc) zoning cannot approve the building plans until the building plans have been approved by the PDSD Commercial Plans reviewers.

2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. (Include a copy as reference of the approved and PDSD stamped and signed version of the DP with the next building plan submittal. (As of this building review by zoning, the DP had not been reviewed or approved, stamped and signed.)

3. COMMENT: Once the plans have been reviewed and approved by the PDSD Commercial Plan Reviewers and zoning has verified consistency with the approved copy of the PDSD stamped and signed DP, the building plans can be approved by zoning.

4. COMMENT: Zoning is willing to review and approve the building plans over the counter with an appointment (and a copy of the PDSD approved, stamped and signed DP) once the zoning above comments have been resolved.

If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: building plans
01/28/2019 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change T18CM08145

1) Engineering has reviewed the building plans and they appear to be in conformance with the unapproved development package (DP18-0244)
2) Coordinate with Development Package (DP) to ensure that roof drains scupper underneath sidewalks. Reference City of Tucson Technical Standards Manual (TSM) section 7-01.4.1.E
3) Once the DP has been approved and any outstanding commercial review comments have been addressed, Engineering can conduct an over the counter review of the building plans. Call or Email to Schedule

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov