Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T18CM08145
Parcel: 107020100

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T18CM08145
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/07/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
01/11/2019 ROBERT SHERRY WATER REVIEW Completed
01/11/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. There is only one junction of the building drain and the building sewer in this warehouse shell but sheet P1.1 shows three 2-way cleanouts. See the definitions for building drain and building sewer in Section 202, IPC 2012. [Initial comment: An approved 2-way cleanout fitting is allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning in the direction of flow. Reference: Sections 708.3.5 and 708.5, IPC 2012.]
2. The water pipe schedule on the new sheet P2.1 allows the use of PEX piping for this activity. Provide instructions for disinfecting PEX pipe that are acceptable to the manufacturer of the material and comparable to the disinfection method described in Section 610.1, IPC 2012. Reference: Section 302.2, IPC 2012.
01/14/2019 QJONES1 ZONING REVIEW Needs Review
01/14/2019 QJONES1 ENGINEERING REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
01/14/2019 QJONES1 APPROVAL SHELF Completed
01/14/2019 QJONES1 OUT TO CUSTOMER Completed
01/14/2019 QJONES1 REJECT SHELF Completed