Permit Number: T18CM08145
Parcel: 107020100

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T18CM08145
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/15/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change Plan reviewer: Gilbert Peru

1. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the new buildings to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012.
2. S3.1 Provide roof framing details for ALTERNATE 1 and 2 that is being called out on the FRAMING KEYNOTES. Specify the types and sizes of the wood trusses called out on ALTERNATE 1.
3. Include ALTERNATE roof construction calculations in the structural calculations. IBC 107.2.1.
4. Please provide written responses to all plan review comments.
10/18/2018 MASHFOR1 FIRE REVIEW Approved Please provide actual storage contents. Sprinkler plans will be supplied as a deferred submittal to TFD
11/01/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide a site plan showing the installation of the water service from the water meter to the building and the installation of the building sewer from the building drain to the connection to the public sewer as part of the building plan set (i.e. not "for reference only"). Reference: Sections 104.2 and 107.2.1, IBC 2012.
2. An approved 2-way cleanout fitting is allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning in the direction of flow. Reference: Sections 708.3.5 and 708.5, IPC 2012.
3. Cleanouts shall open to allow cleaning in the direction of flow; the grade cleanout shown at the northwest end of the building drain appears to open against the flow. Reference: Section 708.5, IPC 2012.
4. Provide the slope of the rain gutter. Based on the use of two downspouts and Table 1106.6, IPC 2012, the 8" gutter would need to have a slope of ½" per 12" to accommodate the roof drainage (i.e. the gutter would drop about 32" from the center of the building to either side of the building. Reference: Section 1106.6, IPC 2012.
11/01/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed No mechanical plans submitted.
11/01/2018 ROBERT SHERRY WATER REVIEW Reqs Change 1. Provide the size of the proposed water meter serving the site along with the size of the reduced pressure backflow preventer. Provide the water demand that the proposed water meter will serve.
2. Clarify the location of the proposed water meter and verify that the water service pipe will remain within the limits of the property. Reference: Remote Meter Policy IV-B.08, Tucson Water.
11/05/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
11/07/2018 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T18CM08145 - New Building (General Manufacturing) Related to DP18-0244
Building Plan Review (1st Review) R & Y Enterprises LLC
3210 N. Freeway Industrial Loop - I-1 Zoning

TRANSMITTAL DATE: November 7, 2018

DUE DATE: November 9, 2018


COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. COMMENT: Zoning has reviewed the building plans for compliance with the current unapproved version of the development package. While the building footprint is consistent with the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc) zoning cannot approve the building plans until the building plans have been approved by the PDSD Commercial Plans reviewers.

2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. (Include a copy as reference of the approved and PDSD stamped version of the DP with the next building plan submittal.

3. COMMENT: If any changes are necessary, due to the PDSD Commercial Plan Reviewer's comments that affect or change the building footprint, height, or square footage, the DP will need to be updated prior to approval of the building plans by Zoning.

4. COMMENT: Clarify if the building is strictly for storage. The Use note on the Development package states that the uses are manufacturing and storage. Clarify which is correct just commercial storage or manufacturing and storage?

5. COMMENT: Once the plans have been reviewed and approved by the PDSD Commercial Plan Reviewers and zoning has verified consistency with the approved and PDSD copy of the signed DP, the building plans can be approved by zoning.


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: building plans
11/07/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change T18CM08145

1) Engineering has reviewed the building plans and they appear to be in conformance with the unapproved development package (DP18-0244)
2) Coordinate with Development Package (DP) to ensure that roof drains scupper underneath sidewalks. Reference City of Tucson Technical Standards Manual (TSM) section 7-01.4.1.E
3) Once the DP has been approved and any outstanding commercial review comments have been addressed, Engineering can conduct an over the counter review of the building plans. Call or Email to Schedule

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007

Final Status

Task End Date Reviewer's Name Type of Review Description
12/26/2018 QJONES1 APPROVAL SHELF Completed
12/26/2018 QJONES1 OUT TO CUSTOMER Completed
12/26/2018 QJONES1 REJECT SHELF Completed