Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T18CM07895
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/02/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 08/16/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The size of cleanouts must be the same as the pipe they service. You have a 3" cleanout for a 4" horizontal drain in one location and a 3" horizontal drain changing to a 4" horizontal drain without a 4" cleanout in another location. [Second comment: The sewer riser on P-1 calls for 4" waste downstream of the sand interceptor but the plumbing plan specified 3" waste. The size of cleanouts must be the same as the pipe they service.] [Initial comment: Explain the "existing 3" waste" shown on the sewer riser diagram.] |
| 08/16/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 08/21/2019 | DAVID RIVERA | ZONING | REVIEW | Approved | |
| 08/27/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/05/2019 | AMARTIN1 | OUT TO CUSTOMER | Completed |