Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW - COMMERCIAL TI
Permit Number - T18CM07849
Review Name: 3RD PARTY REVIEW - COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/09/2018 | MASHFOR1 | FIRE | REVIEW | Approved | |
11/01/2018 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Provide the total demand that will be served by the proposed water meter (i.e. include the pool demand). 2. Clarify the size of the proposed reduced pressure backflow preventer for the community center: it is noted as 1" in the water pressure calculations and 2" on the plumbing site plan, sheet P0.0. |
11/01/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T18CM07849 - New Building (Recreation) Building Plan Review (1st Review) Saguaro Trails Community Center 9925 E. Drexel Road - PAD 30 Zoning (related to DP18-0083) TRANSMITTAL DATE: November 1, 2018 DUE DATE: November 2, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the approved development package issued on August 3, 2018. While the building footprint and the site revisions are consistent with the approved DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc) zoning cannot approve the building plans until the 3rd Party and PDSD Commercial Plans reviewers have approved the building plans. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. (Include a copy of the approved and PDSD stamped version of the DP with the next building submittal.) 3. COMMENT: If any changes are necessary, due to the 3rd Party or PDSD Commercial Plan Reviewer's comments that affect or change the building footprint, height, or square footage, the DP will need to be updated prior to approval of the building plans by Zoning. 4. COMMENT: Once the plans have been reviewed and approved by the 3rd Party and PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. 5. It does not appear that the Development Package included a covered breezeway between the two buildings as depicted on the building plans. Contact PDSD's Alexandra Hines 837-6975 or Kelly Lee 837-6999 for information on revising the DP to include the covered Breezeway. Zoning will not be able to approve the building plans until the DP is revised and signed by the PDSD manager. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Building plans |
11/05/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | T18CM07849 1) Engineering has reviewed the building plans and they appear to be in conformance with the approved development package (DP18-0083) 2) Coordinate with Development Package (DP) to ensure that roof drains scupper underneath sidewalks. Reference City of Tucson Technical Standards Manual (TSM) section 7-01.4.1.E 3) Engineering can conduct an over the counter review once all outstanding department review comments have been addressed John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
12/05/2018 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | AT 3RD PARTY OFFICE | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/05/2018 | KROBLES1 | OUT TO CUSTOMER | Completed |