Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T18CM07809
Parcel: 12904210A

Address:
2050 E 12TH ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T18CM07809
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/07/2018 GPERU1 BUILDING-COMMERCIAL REVIEW Approved
11/07/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. COMcheck envelope analysis not submitted. [Initial comment: Alterations of an existing building in which the existing ceiling or wall cavities are exposed, shall have the exposed cavities filled with insulation. Reference: Section 101.4.3, IECC 2012.]
2. COMcheck envelope analysis not submitted. [Initial comment: Alterations to the building (e.g. new doors, lighting, etc.) shall comply with the current energy code. Provide a COMcheck envelope analysis of the alterations to the building. Reference: Sections C101.4.3 and C103, IECC 2012.]
3. Detail 5/m3.0 specifies a "manufacturer chimney cap or equal": provide the manufacturer's name and model number that is the basis for the design. [Initial comment: Provide the installation instructions for the proposed coffee roasters. Reference: Sections 301.3, 303.1, and 303.6, IFGC 2012.]
11/07/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The manufacturer's listing information calls for an inlet pressure range of 8"WC to 9"WC for natural gas. Verify the input pressure requirements and revise the pressure outlet note for the gas regulator as needed. [Initial comment: Provide the listing information for the proposed gas-fired appliances. Reference: Sections 301.3, 303.1, and 303.6, IFGC 2012.]
2. The revised configuration of the drainage for the 3-compartment sink shows three indirect waste receptors with one trap. Each indirect waste receptor requires a separate trap. Reference: Section 1002, IPC 2012. [Initial comment: Provide separate indirect waste pipes for each compartment of the 3-compartment sink to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012.]
3. Depending on your response to the preceding comment, the 3-compartment sink description in the plumbing fixture schedule may need to be modified. [Initial comment: Coordinate the configuration of the drainage for the 3-compartment sink as shown in the riser diagram and as specified in the plumbing fixture schedule. Reference: Section 107.2.1, IBC 2012.]

Final Status

Task End Date Reviewer's Name Type of Review Description
12/10/2018 QJONES1 APPROVAL SHELF Completed
12/10/2018 QJONES1 OUT TO CUSTOMER Completed
12/10/2018 QJONES1 REJECT SHELF Completed