Permit Number: T18CM07809
Parcel: 12904210A

Address:
2050 E 12TH ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T18CM07809
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/02/2018 EHAMBLI1 ZONING REVIEW Approved
10/02/2018 EHAMBLI1 ENGINEERING REVIEW Passed
10/03/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet S2.0: Please provide structural calculations for the revisions to the roof framing due to new mechanical loads.
2. Sheet a1.0; Detail 6: Please provide a vertical grab bar per the ICC/ANSI Figure 604.5.1.
3. Sheet a1.0; Floor Plan 1; Section 3; Detail 9: Please provide the wall stud spacing.
4. Sheet a1.0; Floor Plan 1: Is the roll up door indicated in the west wall in a new wall opening or an existing opening? Please verify.
5. General: Please provide written responses to all review comments.
10/03/2018 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
10/04/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
10/05/2018 AVAUGHN1 WATER REVIEW Completed
10/09/2018 MASHFOR1 FIRE REVIEW Approved
10/25/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide the listing information for the proposed gas-fired appliances. Reference: Sections 301.3, 303.1, and 303.6, IFGC 2012.
2. Provide air for combustion, ventilation and dilution of the flue gases for the proposed water heater and roasters. Reference: Section 304, IFGC 2012.
3. Provide sediment traps for the gas-fired appliances. Reference: Section 408.4, IFGC 2012.
4. Provide venting for the water heater per the manufacturer's instructions. Reference: Section 503.2.3, IFGC 2012.
5. Provide separate indirect waste pipes for each compartment of the 3-compartment sink to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012.
6. Coordinate the configuration of the drainage for the 3-compartment sink as shown in the riser diagram and as specified in the plumbing fixture schedule. Reference: Section 107.2.1, IBC 2012.
10/26/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Alterations of an existing building in which the existing ceiling or wall cavities are exposed, shall have the exposed cavities filled with insulation. Reference: Section 101.4.3, IECC 2012.
2. Alterations to the building (e.g. new doors, lighting, etc.) shall comply with the current energy code. Provide a COMcheck envelope analysis of the alterations to the building. Reference: Sections C101.4.3 and C103, IECC 2012.
3. Provide the installation instructions for the proposed coffee roasters. Reference: Sections 301.3, 303.1, and 303.6, IFGC 2012.

Final Status

Task End Date Reviewer's Name Type of Review Description
11/06/2018 AVAUGHN1 APPROVAL SHELF Completed
11/06/2018 AVAUGHN1 OUT TO CUSTOMER Completed
11/06/2018 AVAUGHN1 REJECT SHELF Completed